ON THE SCHEDULING OF IDENTICAL PROCESSORS WITH ENTRAPMENT

被引:3
作者
AMAR, AD [1 ]
VASILESCU, EN [1 ]
机构
[1] HOFSTRA UNIV, HEMPSTEAD, NY 11550 USA
关键词
D O I
10.1080/07408178808966155
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:88 / 96
页数:9
相关论文
共 12 条
[1]   SIMULATED VERSUS REAL LIFE DATA IN TESTING THE EFFICIENCY OF SCHEDULING ALGORITHMS [J].
AMAR, AD ;
GUPTA, JND .
IIE TRANSACTIONS, 1986, 18 (01) :16-25
[2]  
Barnes J. W., 1977, AIIE T, V9, P23
[3]  
BARNES JW, 1976, UT763 U TEX AUST REP
[4]  
BERENSON ML, 1986, BASIC BUSINESS STATI
[5]  
BHADURY B, 1970, THESIS N CAROLINA ST
[6]  
Elmaghraby S, 1974, AIIE T, V6, P1, DOI DOI 10.1080/05695557408974926
[7]   COMPLEXITY OF SCHEDULING UNDER PRECEDENCE CONSTRAINTS [J].
LENSTRA, JK ;
RINNOOYKAN, AHG .
OPERATIONS RESEARCH, 1978, 26 (01) :22-35
[8]  
RYAN TA, 1978, MINITAB 2 REFERENCE, P40
[9]  
Smith W.E., 1956, NAV RES LOGIST Q, V3, P59, DOI DOI 10.1002/NAV.3800030106
[10]   AN EMPIRICAL-EVALUATION OF THE ENTRAPMENT PROCEDURE FOR SCHEDULING JOBS ON IDENTICAL MACHINES [J].
VASILESCU, EN ;
AMAR, AD .
IIE TRANSACTIONS, 1983, 15 (03) :261-263