共 62 条
[21]
Dupont-Gatelmand C., A survey of analytical and simulation models for the design and control of flexible manufacturing systems, Nth CIRP International Seminar on Manufacturing Systems, (1982)
[22]
Elmaragiiy H.A., Simulation and graphical animation of advanced manufacturing systems, Journal of Manufacturing Systems, 1, 1, pp. 53-63, (1982)
[23]
Gere W.S., Heuristics in job shop, Management Science, 13, 3, pp. 167-190, (1966)
[24]
Gerwin D., Do's and dont's of computerized manufacturing, Harvard Business Review, 60, 2, pp. 107-116, (1982)
[25]
Goldhar J., Jelinek M., Plan for economies of scope, Harvard Business Review, 61, 6, pp. 141-148, (1983)
[26]
Gupta Y.P., Organizational aspects of flexible manufacturing systems, Technovation, 8, 4, pp. 255-269, (1988)
[27]
Gupta Y.P., Human aspects of flexible manufacturing systems, Production and Inventory Management, 30, 2, pp. 30-36, (1989)
[28]
Gupta Y.P., Bector C.R., Gupta M.C., A review of scheduling rules in flexible manufacturing systems, International Journal of Computer Integrated Manufacturing, 2, 6, pp. 356-377, (1989)
[29]
Gupta Y.P., Goyal S., Flexibility of manufacturing systems: Concepts and measurements, European Journal of Operational Research, 43, 2, pp. 119-135, (1989)
[30]
Gupta Y.P., Somers T., A study of CNC machine breakdown behaviour: Multiple input transfer modeling, IEEE Trans, on Reliability, 38, 3, pp. 285-295, (1989)