STOCHASTIC LEADTIMES IN 2-LEVEL ASSEMBLY SYSTEMS

被引:74
作者
YANO, CA
机构
关键词
D O I
10.1080/07408178708975409
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:371 / 378
页数:8
相关论文
共 10 条
[1]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[2]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56
[3]   A SIMULATION-BASED EXPERIMENTAL INVESTIGATION OF SUPPLY TIMING UNCERTAINTY IN MRP SYSTEMS [J].
GRASSO, ET ;
TAYLOR, BW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :485-497
[4]  
KANET JJ, 1984, INT J PROD RES, V22, P41, DOI 10.1080/00207548408942428
[5]   DYNAMICALLY ADJUSTING THE NUMBER OF KANBANS IN A JUST-IN-TIME PRODUCTION SYSTEM USING ESTIMATED VALUES OF LEADTIME [J].
REES, LP ;
PHILIPOOM, PR ;
TAYLOR, BW ;
HUANG, PY .
IIE TRANSACTIONS, 1987, 19 (02) :199-207
[7]  
WEEKS JK, 1981, 21 ANN C P AM PROD I, P177
[8]  
Whybark D.C., 1976, DECISION SCI, V7, P595, DOI DOI 10.1111/J.1540-5915.1976.TB00704.X
[9]   SETTING PLANNED LEADTIMES IN SERIAL PRODUCTION SYSTEMS WITH TARDINESS COSTS [J].
YANO, CA .
MANAGEMENT SCIENCE, 1987, 33 (01) :95-106
[10]  
YANO CA, 1985, IN PRESS NAVAL RES L