共 48 条
[1]
[2]
[3]
[4]
[6]
Ground fault current distribution in stations supplied by a line composed of a cable and an overhead section
[J].
EUROPEAN TRANSACTIONS ON ELECTRICAL POWER,
2007, 17 (03)
:207-218
[7]
Long-term load forecasting via a hierarchical neural model with time integrators.[J].Otávio A.S. Carpinteiro;Rafael C. Leme;Antonio C. Zambroni de Souza;Carlos A.M. Pinheiro;Edmilson M. Moreira.Electric Power Systems Research.2006, 3
[8]
Long-term/mid-term electric load forecasting based on short-term correlation and annual growth.[J].H.M. Al-Hamadi;S.A. Soliman.Electric Power Systems Research.2005, 3
[9]
A new meta-heuristic algorithm for continuous engineering optimization: harmony search theory and practice.[J].Kang Seok Lee;Zong Woo Geem.Computer Methods in Applied Mechanics and Engineering.2004, 36
[10]
To combine or not to combine: selecting among forecasts and their combinations.[J].Michèle Hibon;Theodoros Evgeniou.International Journal of Forecasting.2004, 1

