DETERMINATION OF COMPLETION TIMES FOR SERIAL MULTIPRODUCT PROCESSES .3. MIXED INTERMEDIATE STORAGE-SYSTEMS

被引:21
作者
WIEDE, W
REKLAITIS, GV
机构
[1] School of Chemical Engineering, Purdue University, West Lafayette, IN 47907, United States
关键词
CHEMICAL PLANTS - Optimization - OPTIMIZATION - Mathematical Models - PRODUCTION ENGINEERING - Mathematical Models;
D O I
10.1016/0098-1354(87)85017-2
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A two step strategy is investigated for scheduling multiunit systems in which blocks of units have four different intermediate storage modes; unlimited or finite storage, storage only in processing units, or no holding between processing steps. The completion time procedure is combined with literature sequence selection methods to yield good schedules for this class of systems. Numerical comparisons with a branch and bound approach indicate that the approximate method yields makespans within 6% on average of the branch and bound solution, often in an order of magnitude less solution time. (Edited author abstact)
引用
收藏
页码:357 / 368
页数:12
相关论文
共 7 条
[1]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[2]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[3]  
JOHNSON SM, 1954, NAV RES LOGIST, V28, P61
[4]   DETERMINATION OF COMPLETION TIMES FOR SERIAL MULTIPRODUCT PROCESSES .1. A 2 UNIT FINITE INTERMEDIATE STORAGE-SYSTEM [J].
WIEDE, W ;
KURIYAN, K ;
REKLAITIS, GV .
COMPUTERS & CHEMICAL ENGINEERING, 1987, 11 (04) :337-344
[5]   DETERMINATION OF COMPLETION TIMES FOR SERIAL MULTIPRODUCT PROCESSES .2. A MULTIUNIT FINITE INTERMEDIATE STORAGE-SYSTEM [J].
WIEDE, W ;
REKLAITIS, GV .
COMPUTERS & CHEMICAL ENGINEERING, 1987, 11 (04) :345-356
[6]  
WIEDE W, 1984, THESIS PURDUE U
[7]   SOLUTION OF FLOWSHOP-SCHEDULING PROBLEM WITH NO INTERMEDIATE QUEUES [J].
WISMER, DA .
OPERATIONS RESEARCH, 1972, 20 (03) :689-&