UTILIZATION OF INTERRUPTED ENERGY ASSESSMENT RATES TO EVALUATE RELIABILITY WORTH IN ELECTRIC-POWER SYSTEMS

被引:24
作者
GOEL, L [1 ]
BILLINTON, R [1 ]
机构
[1] UNIV SASKATCHEWAN,DEPT ELECT ENGN,POWER SYST RES GRP,SASKATOON S7N 0W0,SASKATCHEWAN,CANADA
关键词
CUSTOMER INTERRUPTION COSTS; VALUE OF RELIABILITY;
D O I
10.1109/59.260909
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Power system Planning is concerned both with the level of predicted reliability and the investment/operation alternatives associated with satisfying the desired level. The total societal cost consist of costs associated with required investments arid operation of the system and the customer unsupplied energy costs due to electric supply interruptions. The predicted system reliability in quantitative terms and the consumer costs associated with supply interruptions can be used to compute the customer unserved energy costs. This association is formed by the development of a reliability worth factor designated as the interrupted energy assessment rate (IEAR). This paper shows how IEAR can be utilized in a generating capacity adequacy study, composite system adequacy study and at each individual customer load point and/or sectors within the overall electric power system in an assessment of the monetary worth of reinforcements.
引用
收藏
页码:929 / 936
页数:8
相关论文
共 12 条
[1]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DISTRIBUTION-SYSTEM DATA AND RESULTS [J].
ALLAN, RN ;
BILLINTON, R ;
SJARIEF, I ;
GOEL, L ;
SO, KS .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) :813-820
[2]   UTILIZATION OF INTERRUPTED ENERGY ASSESSMENT RATES IN GENERATION AND TRANSMISSION-SYSTEM PLANNING [J].
BILLINTON, R ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (03) :1245-1253
[3]   COMPARISON OF 2 ALTERNATE METHODS TO ESTABLISH AN INTERRUPTED ENERGY ASSESSMENT RATE [J].
BILLINTON, R ;
OTENGADJEI, J ;
GHAJAR, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1987, 2 (03) :751-757
[4]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DATA [J].
BILLINTON, R ;
KUMAR, S ;
CHOWDHURY, N ;
CHU, K ;
DEBNATH, K ;
GOEL, L ;
KHAN, E ;
KOS, P ;
NOURBAKHSH, G ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1238-1244
[5]  
Billinton R., 1988, RELIABILITY ASSESSME
[6]  
Billinton R, 1982, CUSTOMER DAMAGE RESU
[7]  
Billinton R., 1984, RELIABILITY EVALUATI, DOI [10.1007/978-1-4615-7731-7, DOI 10.1007/978-1-4615-7731-7]
[8]  
BILLINTON R, 1988, IEE P C, V135
[9]  
BILLINTON R, 1984, IEE ELECTRONICS MAR, P231
[10]  
GOEL L, 1991, SUM IEEE PES POW M S