共 10 条
[1]
Progress‐Based Construction Scheduling[J] . Mustafa Pultar.Journal of Construction Engineering and Managemen . 1990 (4)
[2]
NETWORK RESOURCE-ALLOCATION WITH SUPPORT OF A FUZZY EXPERT SYSTEM
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1990, 116 (02)
:239-260
[3]
HYBRID EXPERT SYSTEM FOR CONSTRUCTION PLANNING AND SCHEDULING
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1990, 116 (02)
:221-238
[4]
EXPERT SYSTEMS APPLICATIONS IN CONSTRUCTION MANAGEMENT AND ENGINEERING
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1990, 116 (01)
:87-99
[6]
The Practice of Management Science in R&D Project Management[J] . Matthew J. Liberatore,George J. Titus.Management Science . 1983 (8)
[8]
Computational Comparison of Eight Methods for the Maximum Network Flow Problem[J] . To-Yat Cheung.ACM Transactions on Mathematical Software (TOMS) . 1980 (1)
[9]
Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept[J] . Steve Phillips,Mohamed I. Dessouky.Management Science . 1977 (4)
[10]
Decision CPM: Network Reduction and Solution[J] . Operational Research Quarterly (1970-1977) . 1970 (4)