Integration of reclamation and tailings management in oil sands surface mine planning

被引:31
作者
Badiozamani, Mohammad Mandi [1 ]
Askari-Nasab, Hooman [1 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, MOL, Sch Min & Petr Engn, Edmonton, AB T6G 2W2, Canada
关键词
Reclamation planning; Tailings management; Mine planning; Oil sands; Open-pit mining; Integer programming; Strategic planning; PRODUCTION SCHEDULING PROBLEM; DESIGN;
D O I
10.1016/j.envsoft.2013.09.026
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The processing of oil sands generates large volumes of slurry, known as tailings, that is impounded in tailings ponds. Oil sands operators are committed to develop reclamation plans to ensure that the mine site is restored to a natural or economically usable landscape. Since most of the material that is needed for capping of the tailings pond is produced in mining operation, it is reasonable to include material requirement for reclamation as part of mine planning. In this paper, an integrated long-term mine planning model is proposed that includes tailings capacity and reclamation material requirements. A mixed integer linear programming (MILP) model is developed to test the performance of the proposed model. The MILP model is coded in Matlab (R). It is verified by carrying out a case study on an actual oil sands dataset, and has resulted in an integer solution within a 2% gap to the optimality. The resulted production schedule meets the capacity constraint of the tailings facility and guarantees the production of the required reclamation material. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:45 / 58
页数:14
相关论文
共 27 条
[1]   Mixed integer linear programming formulations for open pit production scheduling [J].
Askari-Nasab H. ;
Pourrahimian Y. ;
Ben-Awuah E. ;
Kalantari S. .
Journal of Mining Science, 2011, 47 (3) :338-359
[2]  
Askari-Nasab H., 2010, P INT C MIN INN MINI
[3]  
Ben-Awuah E., 2012, J ENV IN PRESS 0409
[4]   Oil sands mine planning and waste management using mixed integer goal programming [J].
Ben-Awuah, Eugene ;
Askari-Nasab, Hooman .
INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2011, 25 (03) :226-247
[5]   Characterising performance of environmental models [J].
Bennett, Neil D. ;
Croke, Barry F. W. ;
Guariso, Giorgio ;
Guillaume, Joseph H. A. ;
Hamilton, Serena H. ;
Jakeman, Anthony J. ;
Marsili-Libelli, Stefano ;
Newham, Lachlan T. H. ;
Norton, John P. ;
Perrin, Charles ;
Pierce, Suzanne A. ;
Robson, Barbara ;
Seppelt, Ralf ;
Voinov, Alexey A. ;
Fath, Brian D. ;
Andreassian, Vazken .
ENVIRONMENTAL MODELLING & SOFTWARE, 2013, 40 :1-20
[6]   A strengthened formulation and cutting planes for the open pit mine production scheduling problem [J].
Bley, Andreas ;
Boland, Natashia ;
Fricke, Christopher ;
Froyland, Gary .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) :1641-1647
[7]   LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity [J].
Boland, Natashia ;
Dumitrescu, Irina ;
Froyland, Gary ;
Gleixner, Ambros M. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (04) :1064-1089
[8]   A sliding time window heuristic for open pit mine block sequencing [J].
Cullenbine, Christopher ;
Wood, R. Kevin ;
Newman, Alexandra .
OPTIMIZATION LETTERS, 2011, 5 (03) :365-377
[9]  
Dickert ThomasG., 1985, Environ. Impact Assess. Rev, V5, P37, DOI DOI 10.1016/0195-9255(85)90050-2
[10]   A two-stage programming approach for water resources management under randomness and fuzziness [J].
Guo, P. ;
Huang, G. H. ;
Zhu, H. ;
Wang, X. L. .
ENVIRONMENTAL MODELLING & SOFTWARE, 2010, 25 (12) :1573-1581