Project scheduling under partially renewable resource constraints

被引:65
作者
Böttcher, J
Drexl, A
Kolisch, R
Salewski, F
机构
[1] Univ Kiel, Inst Betriebswirtschaftslehre, D-24118 Kiel, Germany
[2] Tech Univ Darmstadt, Inst Betriebswirtschaftlehre, D-64289 Darmstadt, Germany
关键词
project scheduling; resource constraints; partially renewable resources; branch-and-bound algorithm; serial scheduling scheme;
D O I
10.1287/mnsc.45.4.543
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially renewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make, e.g., timetabling and shift scheduling aspects, amenable to project scheduling. In addition, partially renewable resources serve to model complicated labor regulations. Furthermore, they cover traditional renewable and nonrenewable resource constraints as special cases. We consider makespan minimization as objective. For the exact solution of the problem we employ a basic enumeration scheme. Ln order to speed up convergence, we formulate bounds which take into account future resource consumption of partially renewable resources. Moreover, we generalize the serial scheduling scheme in order to get fast approximation methods. A rigorous assessment of the procedures is provided by solving ProGen instances generated under a full factorial test design. Besides the well-known problem parameters we employ additionally three parameters which control the generation of partially renewable resources.
引用
收藏
页码:543 / 559
页数:17
相关论文
共 34 条
[1]  
[Anonymous], ADV PROJECT SCHEDULI
[2]  
BELL CE, 1991, NAV RES LOG, V38, P315, DOI 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO
[3]  
2-7
[4]  
BELL CE, 1990, NAV RES LOG, V37, P61, DOI 10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO
[5]  
2-S
[6]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[7]   A branch and bound algorithm for the resource-constrained project scheduling problem [J].
Brucker, P ;
Knust, S ;
Schoo, A ;
Thiele, O .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :272-288
[8]  
CARLIER J, 1991, RAIRO-RECH OPER, V25, P311
[9]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273
[10]   HEURISTICS FOR SCHEDULING RESOURCE CONSTRAINED PROJECTS - EXPERIMENTAL INVESTIGATION [J].
COOPER, DF .
MANAGEMENT SCIENCE, 1976, 22 (11) :1186-1194