Spatial and temporal analysis of urban flood risk assessment

被引:58
作者
Ahmad, Shohan S. [1 ]
Simonovic, Slobodan P. [2 ]
机构
[1] Delcan Corp, Ottawa, ON, Canada
[2] Univ Western Ontario, Dept Civil & Environm Engn, London, ON, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
urban flooding; uncertainty; risk; reliability; fuzzy set; time; space; DECISION-MAKING; WATER-RESOURCES; FUZZY; UNCERTAINTY; MANAGEMENT; AGGREGATION; SYSTEM;
D O I
10.1080/1573062X.2012.690437
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Urban flood risk assessment requires quantification of uncertainty that is spatially and temporally variable. This paper presents a new approach to urban flood risk assessment by: (a) integrating objective and subjective uncertainties and (b) providing full insight into spatial and temporal change of flood risk. A 1-D storm sewer model and a 2-D surface flow model are integrated to describe the dynamic interactions between overland flow on the streets and flow through the storm sewer network. The fuzzy set theory approach is used to assess spatial and temporal variability of urban flood damage, and the acceptable level of partial flood damage. The spatial and temporal variability of fuzzy performance indices: (i) combined reliability-vulnerability; (ii) robustness and (iii) resiliency, are generated as the outcome of the urban flood risk analysis. The methodology is illustrated using the residential community of Cedar Hollow (London, Ontario, Canada) as a case study.
引用
收藏
页码:26 / 49
页数:24
相关论文
共 36 条
[1]   A three-dimensional fuzzy methodology for flood risk analysis [J].
Ahmad, S. S. ;
Simonovic, S. P. .
JOURNAL OF FLOOD RISK MANAGEMENT, 2011, 4 (01) :53-74
[2]  
Ahmad S.S., 2007, Applied GIS, V3, P1
[3]   Aggregation of fuzzy views of a large number of stakeholders for multi-objective flood management decision-making [J].
Akter, T ;
Simonovic, SP .
JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2005, 77 (02) :133-143
[4]  
[Anonymous], 2000, RISK AN UNC FLOOD DA
[5]  
[Anonymous], 2010, Reuters
[6]  
[Anonymous], 2010, CBC NEWS
[7]   Flood risk assessment and associated uncertainty [J].
Apel, H ;
Thieken, AH ;
Merz, B ;
Blöschl, G .
NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2004, 4 (02) :295-308
[8]   A fuzzy compromise approach to water resource systems planning under uncertainty [J].
Bender, MJ ;
Simonovic, SP .
FUZZY SETS AND SYSTEMS, 2000, 115 (01) :35-44
[9]   Stakeholder values and scientific modeling in the neuse river watershed [J].
Borsuk, M ;
Clemen, R ;
Maguire, L ;
Reckhow, K .
GROUP DECISION AND NEGOTIATION, 2001, 10 (04) :355-373
[10]   Aggregation operators for soft decision making in water resources [J].
Despic, O ;
Simonovic, SP .
FUZZY SETS AND SYSTEMS, 2000, 115 (01) :11-33