Understanding the critical variables affecting the level of political risks in international construction projects

被引:32
作者
Deng Xiaopeng [1 ]
Pheng, Low Sui [2 ]
机构
[1] Southeast Univ, Dept Construct Management & Real Estate, Nanjing 210096, Jiangsu, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, Singapore 117566, Singapore
关键词
political risks; critical variables; international projects; risk management; construction; FOREIGN-INVESTMENT; JOINT VENTURES; ENTRY MODE; MANAGEMENT; FIRMS; STRATEGIES; BUSINESS; IMPACT;
D O I
10.1007/s12205-013-0354-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Contractors in the international marketplace are experiencing more severe political risks than ever before. They have also in response endeavored to mitigate the high degree of political risk exposure in order to survive. It is important however to identify and manage the critical variables affecting political risks associated with international construction projects. Relatively few studies of political risks, particularly in the context of international projects, have been carried out. The objective of this paper is to examine how international contractors attempt to identify and manage the critical variables which affect the level of political risks when they venture out of their home countries. 85 variables contributing to the level of political risks encountered by international contractors were identified in this paper. Based on the findings from an international survey on political risks, this study reveals that the variables, such as degree of stability of the government, project desirability to the host country, policy uncertainty, racism and xenophobia, and unfavorable attitude towards foreign businesses are the most significant variables. Several recommendations are also provided for international contractors in this paper. This research will assist international contractors to manage the political risk factors when expanding overseas.
引用
收藏
页码:895 / 907
页数:13
相关论文
共 67 条
[21]   Causes of bad profit in overseas construction projects [J].
Han, Seung H. ;
Park, Sang H. ;
Kim, Du Y. ;
Kim, Hyoungkwan ;
Kang, Yun W. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (12) :932-943
[22]   Approaches for making risk-based Go/No-Go decision for international projects [J].
Han, SH ;
Diekmann, JE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (04) :300-308
[23]  
Harris B, 2002, XENOPHOBIA NEW PATHO, P169
[24]   ICRAM-1: Model for international construction risk assessment [J].
Hastak, M ;
Shaked, A .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2000, 16 (01) :59-69
[25]   A TRANSACTION COSTS THEORY OF EQUITY JOINT VENTURES [J].
HENNART, JF .
STRATEGIC MANAGEMENT JOURNAL, 1988, 9 (04) :361-374
[26]   Corporate political strategy formulation: A model of approach, participation, and strategy decisions [J].
Hillman, AJ ;
Hitt, MA .
ACADEMY OF MANAGEMENT REVIEW, 1999, 24 (04) :825-842
[27]  
Hongliang Zhang, 2007, International Journal of Project Management, V25, P694, DOI 10.1016/j.ijproman.2007.02.004
[28]   MODELS OF POLITICAL RISK FOR FOREIGN-INVESTMENT AND TRADE - AN ASSESSMENT OF 3 APPROACHES [J].
HOWELL, LD ;
CHADDICK, B .
COLUMBIA JOURNAL OF WORLD BUSINESS, 1994, 29 (03) :70-91
[29]   Strategies for political risk mediation by international firms in transition economies: the case of Bulgaria [J].
Iankova, E ;
Katz, J .
JOURNAL OF WORLD BUSINESS, 2003, 38 (03) :182-203
[30]   Old problems remain, new ones crop up: Political risk in the 21st century [J].
Jakobsen, Jo .
BUSINESS HORIZONS, 2010, 53 (05) :481-490