Scheduling intermediate storage multipurpose batch plants using the S-graph

被引:23
作者
Romero, J
Puigjaner, L [1 ]
Holczinger, T
Friedler, F
机构
[1] Univ Politecn Catalunya, Dept Chem Engn, E-08028 Barcelona, Spain
[2] Univ Veszprem, Dept Comp Sci, H-8200 Veszprem, Hungary
关键词
scheduling; schedule-graph; intermediate storage; CIS; FIS;
D O I
10.1002/aic.10036
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A graph theoretical approach is proposed for the optimal scheduling of multipurpose batch plants when constraints on intermediate storage allocation are met. The novel S-graph representation is extended and combined with a set of rationales to consider intermediate storage policy in production scheduling. This set of rationales accelerates the optimization procedure, reducing the searching tree from the very beginning, without losing optimality. It is assumed that the storage units can be commonly used throughout the plant to achieve maximum plant flexibility. Therefore, the problem solved suggests the more general batch-process transfer strategy, common intermediate storage policy (CIS). This policy is suggested for more flexible use of intermediate storage units. The accuracy of this proposed algorithm is tested with an exhaustive B&B search algorithm. The methodology is compared with other CIS algorithms and is applied to solve several case studies. The benefits of considering this kind of storage coupled with the use of the proposed algorithm are discussed through motivating examples. (C) 2004 American Institute of Chemical Engineers.
引用
收藏
页码:403 / 417
页数:15
相关论文
共 20 条
[11]   SCHEDULING IN SERIAL MULTIPRODUCT BATCH PROCESSES WITH FINITE INTERSTAGE STORAGE - A MIXED INTEGER LINEAR PROGRAM FORMULATION [J].
KU, HM ;
KARIMI, IA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1988, 27 (10) :1840-1848
[12]   Maximum order tree algorithm for optimal scheduling of product distribution lines [J].
Mokashi, SD ;
Kokossis, AC .
AICHE JOURNAL, 2002, 48 (02) :287-301
[13]   A CONTINUOUS-TIME MIXED-INTEGER LINEAR-PROGRAMMING MODEL FOR SHORT-TERM SCHEDULING OF MULTISTAGE BATCH PLANTS [J].
PINTO, JM ;
GROSSMANN, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1995, 34 (09) :3037-3051
[14]   Assignment and sequencing models for thescheduling of process systems [J].
Jose M. Pinto ;
Ignacio E. Grossmann .
Annals of Operations Research, 1998, 81 (0) :433-466
[15]  
REKLAITIS G, 1991, P INT S PROC SYST EN
[16]   Combinatorial framework for effective scheduling of multipurpose batch plants [J].
Sanmartí, E ;
Puigjaner, L ;
Holczinger, T ;
Friedler, F .
AICHE JOURNAL, 2002, 48 (11) :2557-2570
[17]   A simple continuous-time process scheduling formulation and a novel solution algorithm [J].
Schilling, G ;
Pantelides, CC .
COMPUTERS & CHEMICAL ENGINEERING, 1996, 20 :S1221-S1226
[18]  
SHAH N, 1998, AM I CHEM ENG S SERI, V320, P91
[19]   MILP model for scheduling and design of a special class of multipurpose batch plants [J].
Voudouris, VT ;
Grossmann, IE .
COMPUTERS & CHEMICAL ENGINEERING, 1996, 20 (11) :1335-1360
[20]  
WIEDE W, 1984, THESIS PURDUE U W LA