Modelling detailed information flows in building design with the parameter-based design structure matrix

被引:65
作者
Pektas, ST [1 ]
Pultar, M [1 ]
机构
[1] Bilkent Univ, Fac Art Design & Architecture, TR-06800 Ankara, Turkey
关键词
design management; design processes; modelling; planning; information processing;
D O I
10.1016/j.destud.2005.07.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Architecture/Engineering/Construction (AEC) industry is one of the multidisciplinary domains in which collaboration among related parties is of utmost importance. Despite the intense flow of information between design professionals, there is a lack of research to better understand and manipulate these flows. Most of the current process modelling tools in the AEC industry do not enable analyses of iterative information cycles. Moreover, these tools represent the process at high levels, thus, they are inadequate for multi-parameter problems like building design. With a view to alleviate these problems, this paper introduces the use of parameter-based design structure matrix as a process modelling and system analysis tool for building design. The method reveals insights into the process structure, optimum sequence of parameter decisions, iterative cycles and concurrency in the process. The application of the method is demonstrated through a case study on suspended ceiling design in a real-life project. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:99 / 122
页数:24
相关论文
共 51 条
[31]  
PEKTAS ST, 2003, INNOVATIVE DEV ARCHI, P63
[32]  
PEKTAS ST, 2003, THESIS BILKENT U ANK
[33]  
PHILLIPS R, 2001, ARCHITECTS PLAN WORK
[34]  
Pugh S., 1986, DESIGN STUDIES, V7, P167
[35]   PROGRESS-BASED CONSTRUCTION SCHEDULING [J].
PULTAR, M .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04) :670-688
[36]  
REZGUI Y, 2002, P INT COUNC RES INN
[37]   Toward a more flexible Web-based framework for multidisciplinary design [J].
Rogers, JL ;
Salas, AO .
ADVANCES IN ENGINEERING SOFTWARE, 1999, 30 (07) :439-444
[38]  
ROTHEROE K, 2002, ARCHITECTURE WEEK
[39]   Change management in concurrent engineering from a parameter perspective [J].
Rouibah, K ;
Caskey, KR .
COMPUTERS IN INDUSTRY, 2003, 50 (01) :15-34
[40]  
ROUNCE G, 1998, INT J PROJ MANAG, V16, P123