A multiple-attribute method for concurrently solving the pickup-dispatching problem and the load-selection problem of multiple-load AGVs

被引:48
作者
Ho, Ying-Chin [1 ]
Liu, Hao-Cheng [1 ]
Yih, Yuehwern [2 ]
机构
[1] Natl Cent Univ, Inst Ind Management, Chungli 32001, Taiwan
[2] Purdue Univ, Sch Ind Engn, W Lafayette, IN 47907 USA
关键词
Multiple-load AGVs; Pickup dispatching; Load selection; Multiple-attribute; AUTOMATED GUIDED VEHICLES; FLEXIBLE MANUFACTURING SYSTEM; JIT ENVIRONMENT; PETRI-NET; RULES; PERFORMANCE; SIMULATION; STRATEGIES; ALGORITHM; DESIGN;
D O I
10.1016/j.jmsy.2012.03.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The pickup dispatching and the load selection are two control problems in multiple-load AGVs. Although they affect each other and are affected by various attributes, many researchers have solved them as separate problems and adopted single-attribute methods for them. In this paper, we propose a multiple-attribute method that can solve them simultaneously. The proposed method has four stages: preparation, clustering, evaluation and execution. At the preparation stage, we calculate the weights for three attributes (i.e., slack time, waiting time and distance) that are important to our problems based on the system's current status. These weights will be useful at the second and third stages. At the clustering stage, parts needing vehicle service are clustered into part groups based on their similarity in these three attributes. At the evaluation stage, part groups are evaluated by considering these three attributes. The part group with the greatest evaluation value will be served by the AGV. At the execution stage, a procedure is proposed to assist the AGV in picking up parts efficiently. Simulations were conducted to test the performance of the proposed method in throughput, flow time, and tardiness. The results show that the proposed method outperforms not only single-attribute methods, but also methods that solve pickup dispatching and load selection separately. (C) 2012 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:288 / 300
页数:13
相关论文
共 37 条
[11]  
Ho Y. Ch., 2000, INT J MANUFACTURING, V1, P218
[12]   A machine-to-loop assignment and layout design methodology for tandem AGV systems with multiple-load vehicles [J].
Ho, YC ;
Hsieh, PF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (04) :801-832
[13]   A simulation study on the performance of pickup-dispatching rules for multiple-load AGVs [J].
Ho, Ying-Chin ;
Liu, Hao-Cheng .
COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 51 (03) :445-463
[14]   The performance of load-selection rules and pickup-dispatching rules for multiple-load AGVs [J].
Ho, Ying-Chin ;
Liu, Hao-Cheng .
JOURNAL OF MANUFACTURING SYSTEMS, 2009, 28 (01) :1-10
[15]  
Hwang H, 1998, J MANUF SYST, V17, P137, DOI 10.1016/S0278-6125(98)80026-5
[16]   A multi-attribute dispatching rule for automated guided vehicle systems [J].
Jeong, BH ;
Randhawa, SU .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (13) :2817-2832
[17]  
Kim SH, 1999, INT J PROD ECON, V60-1, P465, DOI 10.1016/S0925-5273(98)00132-7
[18]  
King RE, 1989, PROGR MAT HANDLING L
[19]   AGV dispatching [J].
Klein, CM ;
Kim, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (01) :95-110
[20]   Vehicle travel time models for AGV systems under various dispatching rules [J].
Koo, PH ;
Jang, J .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2002, 14 (03) :249-261