共 25 条
[1]
Abudayyeh O.Y., 1993, J COMPUT CIVIL ENG, V7, P181, DOI DOI 10.1061/(ASCE)0887-3801(1993)7:2(181)
[2]
ASHLEY DB, 1977, J CONSTRUCT DIV-ASCE, V103, P369
[3]
PROFIT MEASURES FOR CONSTRUCTION PROJECTS
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1986, 112 (02)
:273-286
[4]
CHEN HL, 2000, P 1M INT S AUT ROB C, P659
[6]
Deb K., 2002, Multi-objective optimisation using Evolutionary algorithms
[7]
ELAZOUNI A, 2009, 2 INT CONSTR SPEC C
[8]
Finance-based scheduling of construction projects using integer programming
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2004, 130 (01)
:15-24
[10]
Expanding finance-based scheduling to devise overall-optimized project schedules
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2007, 133 (01)
:86-90