Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head

被引:72
作者
Cheng, Chuntian [1 ]
Shen, Jianjian [1 ]
Wu, Xinyu [1 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
基金
中国国家自然科学基金;
关键词
Multivibration zones; Short-term scheduling; Peak load regulation; Large-scale hydropower system; POWER-FLOW LITERATURE; UNIT COMMITMENT; RESERVOIR MANAGEMENT; MODEL; OPERATION; ALGORITHM;
D O I
10.1061/(ASCE)WR.1943-5452.0000174
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction of huge hydropower plants in the southern region of China has been rapidly increasing in recent years. These plants usually have multiple vibration zones of high head that have a great effect on short-term scheduling and real-time operations. This paper presents a novel approach for optimizing short-term scheduling of large-scale cascaded hydropower systems with multivibration zones of high head. For the purpose of cutting down peak loads, standard deviation minimization relevant to the remaining load series for thermal systems was chosen as the objective nonlinear function. Before the optimization, unit forbidden operation zones were identified by assembled mathematical techniques and hydro unit commitments were optimized using dynamic programming. The combined sets of forbidden operation zones and hydro unit commitments were repeatedly used during the search process. An optimization framework that combined the progressive optimality algorithm with a vibration zone avoidance strategy was finally presented to solve the short-term hydropower scheduling problem. The proposed methodology was applied to a case study in China and the results obtained indicate that it is able to not only handle complex constraints of multivibration zones, but also provide efficient and feasible solutions for short-term scheduling of large plants. DOI: 10.1061/(ASCE)WR.1943-5452.0000174. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:257 / 267
页数:11
相关论文
共 31 条
[11]   NEW ALGORITHM FOR SOLUTION OF MULTISTATE DYNAMIC-PROGRAMMING PROBLEMS [J].
HOWSON, HR ;
SANCHO, NGF .
MATHEMATICAL PROGRAMMING, 1975, 8 (01) :104-116
[12]   OPTIMAL SHORT-TERM HYDRO SCHEDULING INCLUDING SECURITY CONSTRAINTS [J].
JOHANNESEN, A ;
GJELSVIK, A ;
FOSSO, OB ;
FLATABO, N .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) :576-583
[13]   Optimal operation of multireservoir systems: State-of-the-art review [J].
Labadie, JW .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2004, 130 (02) :93-111
[14]   SHORT-TERM HYDROELECTRIC SCHEDULING USING THE PROGRESSIVE OPTIMALITY ALGORITHM [J].
LUCAS, NJD ;
PERERA, PJ .
WATER RESOURCES RESEARCH, 1985, 21 (09) :1456-1458
[15]   DYNAMIC-MODEL FOR MULTIRESERVOIR OPERATION [J].
MARINO, MA ;
LOAICIGA, HA .
WATER RESOURCES RESEARCH, 1985, 21 (05) :619-630
[16]   QUADRATIC MODEL FOR RESERVOIR MANAGEMENT - APPLICATION TO THE CENTRAL VALLEY PROJECT [J].
MARINO, MA ;
LOAICIGA, HA .
WATER RESOURCES RESEARCH, 1985, 21 (05) :631-641
[17]   A review of selected optimal power flow literature to 1993 part II: Newton, linear programming and interior point methods. [J].
Momoh, JA ;
El-Hawary, ME ;
Adapa, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (01) :105-111
[18]   APPLICATION OF PROGRESSIVE OPTIMALITY ALGORITHM TO OPTIMAL HYDROTHERMAL SCHEDULING CONSIDERING DETERMINISTIC AND STOCHASTIC DATA [J].
NANDA, J ;
BIJWE, PR ;
KOTHARI, DP .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1986, 8 (01) :61-64
[19]   OPTIMAL HYDROTHERMAL SCHEDULING WITH CASCADED PLANTS USING PROGRESSIVE OPTIMALITY ALGORITHM [J].
NANDA, J ;
BIJWE, PR .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (04) :2093-2099
[20]   Hydro system scheduling using ANN approach [J].
Naresh, R ;
Sharma, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (01) :388-395