A meta-analysis of teamwork processes: Tests of a multidimensional model and relationships with team effectiveness criteria

被引:618
作者
LePine, Jeffery A. [1 ]
Piccolo, Ronald F. [2 ]
Jackson, Christine L. [3 ]
Mathieu, John E. [4 ]
Saul, Jessica R.
机构
[1] Univ Florida, Dept Management, Gainesville, FL 32611 USA
[2] Univ Cent Florida, Orlando, FL 32816 USA
[3] Purdue Univ, W Lafayette, IN 47907 USA
[4] Univ Connecticut, Storrs, CT 06269 USA
关键词
D O I
10.1111/j.1744-6570.2008.00114.x
中图分类号
B849 [应用心理学];
学科分类号
040203 ;
摘要
Drawing from Marks, Mathieu, and Zaccaro (2001), we proposed that narrowly focused teamwork processes load onto 3 higher-order teamwork process dimensions, which in turn load onto a general teamwork process factor. Results of model testing using meta-analyses of relationships among narrow teamwork processes provided support for the structure of this multidimensional theory of teamwork process. Meta-analytic results also indicated that teamwork processes have positive relationships with team performance and member satisfaction, and that the relationships are similar across the teamwork dimensions and levels of process specificity. Supplemental analyses revealed that the 3 intermediate-level teamwork processes are positively and strongly related to cohesion and potency. Results of moderator analyses suggested that relationships among teamwork processes and team performance are somewhat dependent on task interdependence and team size.
引用
收藏
页码:273 / 307
页数:35
相关论文
共 183 条
[71]   EFFECTS OF WORK ORGANIZATION, LEADERSHIP STYLE, AND MEMBER COMPATIBILITY UPON PRODUCTIVITY OF SMALL GROUPS WORKING ON A MANIPULATIVE TASK [J].
HEWETT, TT ;
OBRIEN, GE ;
HORNIK, J .
ORGANIZATIONAL BEHAVIOR AND HUMAN PERFORMANCE, 1974, 11 (02) :283-301
[72]   Collective enactment of leadership roles and team effectiveness: A field study [J].
Hiller, Nathan J. ;
Day, David V. ;
Vance, Robert J. .
LEADERSHIP QUARTERLY, 2006, 17 (04) :387-397
[73]   Teamwork quality and the success of innovative projects: A theoretical concept and empirical evidence [J].
Hoegl, M ;
Gemuenden, HG .
ORGANIZATION SCIENCE, 2001, 12 (04) :435-449
[74]   Managing task interdependencies in multi-team projects: A longitudinal study [J].
Hoegl, M ;
Weinkauf, K .
JOURNAL OF MANAGEMENT STUDIES, 2005, 42 (06) :1287-1308
[75]   Interteam coordination, project commitment, and teamwork in multiteam R&D projects: A longitudinal study [J].
Hoegl, M ;
Weinkauf, K ;
Gemuenden, HG .
ORGANIZATION SCIENCE, 2004, 15 (01) :38-55
[76]   Goal setting and team performance in innovative projects: On the moderating role of teamwork quality [J].
Hoegl, M ;
Parboteeah, KP .
SMALL GROUP RESEARCH, 2003, 34 (01) :3-19
[77]  
Hunter John E., 1990, METHODS META ANAL
[78]   An examination of the relationship between work group characteristics and performance: Once more into the breech [J].
Hyatt, DE ;
Ruddy, TM .
PERSONNEL PSYCHOLOGY, 1997, 50 (03) :553-585
[79]   Teams in organizations: From input-process-output models to IMOI models [J].
Ilgen, DR ;
Hollenbeck, JR ;
Johnson, M ;
Jundt, D .
ANNUAL REVIEW OF PSYCHOLOGY, 2005, 56 :517-543
[80]  
ISABELLA LA, 1994, J MANAGE, V20, P835