共 28 条
[1]
SCHEDULE-BASED CONSTRUCTION INCENTIVES
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1989, 115 (03)
:430-443
[2]
Androkovich R. A., 1990, ATLANTIC ECON J, V18, P38
[3]
Antill J.M., 1990, CRITICAL PATH METHOD
[4]
Incentive/disincentive provisions in highway contracts
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (03)
:302-307
[5]
Ashley D. B., 1985, UTCEPM853
[6]
ASHLEY DB, 1985, UTCEPM852
[7]
Bernhard R. H., 1988, Engineering Economist, V33, P181, DOI 10.1080/00137918808966953
[8]
Bradley C. E., 1972, DECISION SCI, V3, P15