Unit Commitment solution using an optimized genetic system

被引:26
作者
Abookazemi, Kaveh [1 ]
Ahmad, Hussein [2 ]
Tavakolpour, Alireza [3 ]
Hassan, Mohd Y. [1 ]
机构
[1] UTM, CEES, Skudai 81310, Johor, Malaysia
[2] UTM, Fac Elect Engn, Skudai 81310, Johor, Malaysia
[3] UTM, Fac Mech Engn, Skudai 81310, Johor, Malaysia
关键词
Unit Commitment; Genetic Algorithm; Parallel structure; Optimization technique; PROGRAMMING APPROACH; ALGORITHM; NETWORK;
D O I
10.1016/j.ijepes.2011.01.009
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
This paper presents an investigation into the application of an optimized Genetic Algorithm (GA) to solve the Thermal Unit Commitment (UC) problem. A Parallel structure was first developed to handle the infeasibility problem in a structured and improved GA which provides an effective search process and therefore greater economy. The proposed methodology resulted in a better performance with faster operation by using both computational methods and classification of unit characteristics. Typical constraints such as system power balance, minimum up and down times, start-up and shut-down ramps, have also been considered. A number of important parameters (standard and new parameters) of the UC problem have been identified. The proposed method is implemented and tested using a C# program. The tests are carried out using two systems including 10 and 20 units during a scheduling period of 24 h. The results are finally compared with those obtained from genetic schemes in other similar investigations through which the effectiveness of the proposed scheme is affirmed. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:969 / 975
页数:7
相关论文
共 25 条
[1]
Arroyo J., 2002, IEEE T POWER SYST, V17
[2]
BURNS RM, 1975, IEEE PES M SAN FRANC
[3]
DASGUPTA D, 1994, IEE P GENER T DISTRI, V4
[4]
Ramp rate constrained unit commitment by improved priority list and augmented Lagrange Hopfield network [J].
Dieu, Vo Ngoc ;
Ongsakul, Weerakorn .
ELECTRIC POWER SYSTEMS RESEARCH, 2008, 78 (03) :291-301
[5]
INTEGER PROGRAMMING APPROACH TO THE PROBLEM OF OPTIMAL UNIT COMMITMENT WITH PROBABILISTIC RESERVE DETERMINATION [J].
DILLON, TS ;
EDWIN, KW ;
KOCHS, HD ;
TAUD, RJ .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1978, 97 (06) :2154-2166
[6]
GANGULY D, 2004, INT C POW SYST TECHN
[7]
HAMDAM AR, 1991, IEE P C, V138, P553
[8]
A genetic algorithm solution to the unit commitment problem [J].
Kazarlis, SA ;
Bakirtzis, AG ;
Petridis, V .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) :83-90
[9]
LIAO GC, 2006, INT J ELECT POWER EN
[10]
MA X, 1995, GENETIC ALGORITHM BA