共 40 条
[1]
Alvarez-Valdes A., 1989, ADV PROJECT SCHEDULI, P113
[2]
[Anonymous], REV FRANCAISE RECHER
[3]
Bedworth D.D., 1982, Integrated Production, Control Systems: Management, Analysis, and Design
[6]
CASINO EV, 1995, MODELIZACION GRAFOS
[9]
COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
[J].
MANAGEMENT SCIENCE SERIES B-APPLICATION,
1975, 21 (08)
:944-955