A heuristic for network project scheduling with random activity durations depending on the resource allocation

被引:52
作者
Golenko-Ginzburg, D [1 ]
Gonik, A [1 ]
机构
[1] Ben Gurion Univ Negev, Dept Ind Engn & Management, IL-84105 Beer Sheva, Israel
关键词
lexicographical scanning; non-consumable resources; stochastic network project; resource constrained project scheduling; variable resource capacities;
D O I
10.1016/S0925-5273(98)00044-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a heuristic for resource-constrained network project scheduling. A PERT-type project, where activities require resources of various types with variable capacities,is considered. Each activity is of random duration depending on the resource amounts assigned to that activity. The problem is to minimize the expected project duration by determining for each activity its starting time and the assigned resource capacities. The resource project scheduling model is an NP-complete knapsack resource reallocation problem. To obtain a precise solution, a lookover algorithm has been developed. For the case when a lookover requires much computational time, an approximate heuristic algorithm is suggested. The problem has to be solved at each decision point, when at least more than one activities are ready to be operated but the available amount of resources is limited. The heuristic model is illustrated by a numerical example. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:149 / 162
页数:14
相关论文
共 21 条
[1]  
[Anonymous], 2014, PROBABILITY STAT ENG
[2]  
ARTIGUES C, 1998, IN PRESS J INT ENG
[3]  
BELL CE, 1991, NAV RES LOG, V38, P315, DOI 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO
[4]  
2-7
[5]   Resource-constrained project scheduling by simulated annealing [J].
Boctor, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) :2335-2351
[6]  
Coffman Jr E. G., 1976, COMPUTER JOB SHOP SC
[7]   Production control in semi-automated systems: Comparison between constant and stochastic speeds [J].
Friedman, L ;
GolenkoGinzburg, D ;
SinuanyStern, Z .
PRODUCTION PLANNING & CONTROL, 1996, 7 (02) :176-183
[8]  
GOLENKOGINZBURG.A, 1997, INT J PROD ECON, V48, P29
[9]  
KOLISH R, 1995, RPOJECT SCHEDULING R
[10]  
Lorterapong P., 1994, PROJECT MANAGEMENT J, V25, P12