摘要
In this study, we consider total flow time problem in a flexible flowshop environment. We develop a branch and bound algorithm to find the optimal schedule. The efficiency of the algorithm is enhanced by upper and lower bounds and a dominance criterion. Computational experience reveals that the algorithm solves moderate sized problems in reasonable solution times. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:528 / 538
页数:11
相关论文
共 27 条
[1]   IMPROVED LOWER BOUNDS FOR MINIMIZING THE SUM OF COMPLETION TIMES OF N-JOBS OVER M-MACHINES IN A FLOW-SHOP [J].
AHMADI, RH ;
BAGCHI, U .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 44 (03) :331-336
[2]  
Arthanary T., 1971, Opsearch J. Oper. Res. Soc. India, V8, P10
[3]  
Bansal S. P., 1977, AIIE Transactions, V9, P306, DOI 10.1080/05695557708975160
[4]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[5]  
Conway R.W., 1967, Theory of Scheduling
[6]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[7]   TEXTILE PRODUCTION SYSTEMS - A SUCCESSION OF NONIDENTICAL PARALLEL PROCESSOR SHOPS [J].
GUINET, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1991, 42 (08) :655-671
[8]   Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time [J].
Guinet, AGP ;
Solomon, MM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (06) :1643-1654
[9]   2-STAGE, HYBRID FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (04) :359-364
[10]   SCHEDULING A 2-STAGE HYBRID FLOWSHOP WITH SEPARABLE SETUP AND REMOVAL TIMES [J].
GUPTA, JND ;
TUNC, EA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 77 (03) :415-428