Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time

被引:94
作者
Guinet, AGP
Solomon, MM
机构
[1] INSA de Lyon, Laboratoire d’Informatique des Systemes de Production Industrielle, Villeurbanne, 69621, bât. 403
[2] College of Business Administration, Northeastern University, Boston, MA
关键词
D O I
10.1080/00207549608904988
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The problem of scheduling independent jobs on several serial workshops consisting of identical parallel machines is studied. Each job is processed by one machine in each workshop. This workshop environment is called a hybrid Flowshop. Each job has its own due-date and the objective is to minimize maximum tardiness or maximum completion time. Given that the problem is NP-hard, a set of list algorithms is developed to solve it. To evaluate the quality of these heuristics, lower bounds on the optimal solution have been derived and compared to the value of the heuristics on 1920 problems. Our results indicate that a heuristic based on Nawaz et al. (1983) method outperformed the other approaches.
引用
收藏
页码:1643 / 1654
页数:12
相关论文
共 33 条
[1]  
BRUKER P, 1981, COMPUTING, V27, P367
[2]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[3]   A STATE-OF-THE-ART REVIEW OF PARALLEL-MACHINE SCHEDULING RESEARCH [J].
CHENG, TCE ;
SIN, CCS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 47 (03) :271-292
[4]   EVALUATION OF A HEURISTIC FOR SCHEDULING INDEPENDENT JOBS ON PARALLEL IDENTICAL PROCESSORS [J].
DOGRAMACI, A ;
SURKIS, J .
MANAGEMENT SCIENCE, 1979, 25 (12) :1208-1216
[5]  
French S., 1982, Sequencing and Scheduling
[6]   ON FLOWSHOP SCHEDULING WITH RELEASE AND DUE DATES TO MINIMIZE MAXIMUM LATENESS [J].
GRABOWSKI, J ;
SKUBALSKA, E ;
SMUTNICKI, C .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1983, 34 (07) :615-620
[7]  
Grabowski J., 1980, Opsearch, V17, P133
[8]   TEXTILE PRODUCTION SYSTEMS - A SUCCESSION OF NONIDENTICAL PARALLEL PROCESSOR SHOPS [J].
GUINET, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1991, 42 (08) :655-671
[9]  
GUINET A, 1996, IN PRESS INT J PRODU
[10]   SCHEDULES FOR A 2-STAGE HYBRID FLOWSHOP WITH PARALLEL MACHINES AT THE 2ND STAGE [J].
GUPTA, JND ;
TUNC, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1489-1502