A coordinated production planning model with capacity expansion and inventory management

被引:56
作者
Rajagopalan, S [1 ]
Swaminathan, JM
机构
[1] Univ So Calif, Marshall Sch Business, Los Angeles, CA 90089 USA
[2] Univ N Carolina, Kenan Flagler Business Sch, Chapel Hill, NC 27599 USA
关键词
production planning; multiproduct inventory; capacity expansion; equipment purchase; mathematical programming; heuristics;
D O I
10.1287/mnsc.47.11.1562.10254
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Motivated by a problem faced by a large manufacturer of a consumer product, we explore the interaction between production planning and capacity acquisition decisions in environments with demand growth. We study a firm producing multiple items in a multiperiod environment where demand for items is known but varies over time with a long-term growth and possible short-term fluctuations. The production equipment is characterized by significant changeover time between the production of different items. While demand growth is gradual, capacity additions are discrete. Therefore, periods immediately following a machine purchase are characterized by excess machine capacity. We develop a mathematical programming model and an effective solution approach to determine the optimal capacity acquisition, production and inventory decisions over time. Through a computational study, we show the effectiveness of the solution approach in terms of solution quality and investigate the impact of product variety, cost of capital, and other important parameters on the capacity and inventory decisions. The computational results bring out some key insights-increasing product variety may not result in excessive inventory and even a substantial increase In set-up times or holding costs may not increase the total cost over the horizon in a significant manner due to the ability to acquire additional capacity We also provide solutions and insights to the real problem that motivated this work.
引用
收藏
页码:1562 / 1580
页数:19
相关论文
共 17 条
[1]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[2]   A managerial perspective on aggregate planning [J].
Buxey, G .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 41 (1-3) :127-133
[3]   A STATE-OF-THE-ART REVIEW OF PARALLEL-MACHINE SCHEDULING RESEARCH [J].
CHENG, TCE ;
SIN, CCS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 47 (03) :271-292
[4]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[5]   A REVIEW OF PRODUCTION SCHEDULING [J].
GRAVES, SC .
OPERATIONS RESEARCH, 1981, 29 (04) :646-675
[6]   LOT SIZES, LEAD TIMES AND IN-PROCESS INVENTORIES [J].
KARMARKAR, US .
MANAGEMENT SCIENCE, 1987, 33 (03) :409-418
[7]   THE ECONOMIC LOT SCHEDULING PROBLEM - THEORY AND PRACTICE [J].
LOPEZ, MAN ;
KINGSMAN, BG .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1991, 23 (1-3) :147-164
[9]   ADDRESSING THE GAP IN SCHEDULING RESEARCH - A REVIEW OF OPTIMIZATION AND HEURISTIC METHODS IN PRODUCTION SCHEDULING [J].
MACCARTHY, BL ;
LIU, JY .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (01) :59-79
[10]  
MAES J, 1988, J OPER RES SOC, V39, P991, DOI 10.2307/2583198