Production lot sizing with process deterioration and machine breakdown

被引:63
作者
Chakraborty, Tulika [1 ]
Giri, B. C. [1 ]
Chaudhuri, K. S. [1 ]
机构
[1] Jadavpur Univ, Dept Math, Kolkata 700032, W Bengal, India
关键词
production; machine breakdown and repair; maintenance;
D O I
10.1016/j.ejor.2007.01.011
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper presents a generalized economic manufacturing quantity model for an unreliable production system in which the production facility may shift from an 'in-control' state to an 'out-of-control' state at any random time (when it starts producing defective items) and may ultimately break down afterwards. If a machine breakdown occurs during a production run, then corrective repair is done; otherwise, preventive repair is performed at the end of the production run to enhance the system reliability. The proposed model is formulated assuming that the time to machine breakdown, corrective and preventive repair times follow arbitrary probability distributions. However, the criteria for the existence and uniqueness of the optimal production time are derived under general breakdown and uniform repair time (corrective and preventive) distributions. The optimal production run time is determined numerically and the joint effect of process deterioration, machine breakdowns and repairs (corrective and preventive) on the optimal decisions is investigated for a numerical example. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:606 / 618
页数:13
相关论文
共 30 条
[1]   Integrating quality and maintenance decisions in a production-inventory model for deteriorating items [J].
Alfares, HK ;
Khursheed, SN ;
Noman, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (05) :899-911
[2]   PRODUCTION-INVENTORY SYSTEMS WITH UNRELIABLE MACHINES [J].
BERG, M ;
POSNER, MJM ;
ZHAO, H .
OPERATIONS RESEARCH, 1994, 42 (01) :111-118
[3]   The impact of imperfect processes on production run times [J].
Boone, T ;
Ganeshan, R ;
Guo, YM ;
Ord, JK .
DECISION SCIENCES, 2000, 31 (04) :773-787
[4]   AN ECONOMIC ORDER QUANTITY MODEL WITH DEMAND-DEPENDENT UNIT PRODUCTION COST AND IMPERFECT PRODUCTION PROCESSES [J].
CHENG, TCE .
IIE TRANSACTIONS, 1991, 23 (01) :23-28
[5]   Bounds for production lot sizing with machine breakdowns [J].
Chung, KJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (01) :139-144
[6]  
CHUNG KL, 1997, NAV RES LOG, V44, P257
[7]   Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment [J].
Dohi, T ;
Okamura, H ;
Osaki, S .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) :147-155
[8]   Exact formulation of stochastic EMQ model for an unreliable production system [J].
Giri, BC ;
Dohi, T .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (05) :563-575
[9]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123
[10]   PRODUCTION BATCHING WITH MACHINE BREAKDOWNS AND SAFETY STOCKS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1992, 40 (05) :959-971