Survey of scheduling research involving setup times

被引:70
作者
Yang, WH [1 ]
Liao, CJ [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
关键词
D O I
10.1080/002077299292498
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We review the static scheduling research in which the setup time or cost is of main concern in the problem studied. The literature is classified into job, class and job-and-class setup situations. Also, each situation is further classifed on the basis of sequence dependence and separability of setup. Directions for future research on setup time problems are also identified.
引用
收藏
页码:143 / 155
页数:13
相关论文
共 137 条
[1]   BPSS - A SCHEDULING SUPPORT SYSTEM FOR THE PACKAGING INDUSTRY [J].
ADLER, L ;
FRAIMAN, N ;
KOBACKER, E ;
PINEDO, M ;
PLOTNICOFF, JC ;
WU, TP .
OPERATIONS RESEARCH, 1993, 41 (04) :641-648
[2]   SINGLE FACILITY MULTICLASS JOB SCHEDULING [J].
AHN, BH ;
HYUN, JH .
COMPUTERS & OPERATIONS RESEARCH, 1990, 17 (03) :265-272
[3]  
[Anonymous], 1966, MANAGEMENT SCI
[4]  
ARTHANARI TS, 1971, OPSEARCH, V7, P147
[5]  
BAKER KR, 1974, AIIE T, V20, P32
[6]  
BAKSHI MS, 1969, MANAGE SCI B-APPL, V16, pB247
[7]   SCHEDULING JOBS WITH LINEAR DELAY PENALTIES AND SEQUENCE DEPENDENT SETUP COSTS [J].
BARNES, JW ;
VANSTON, LK .
OPERATIONS RESEARCH, 1981, 29 (01) :146-160
[8]   TRAVELING SALESMAN PROBLEM - A SURVEY [J].
BELLMORE, M ;
NEHAUSE.GL .
OPERATIONS RESEARCH, 1968, 16 (03) :538-&
[9]   AN INTERACTIVE PROCEDURE FOR BI-CRITERIA PRODUCTION SCHEDULING [J].
BERNARDO, JJ ;
LIN, KS .
COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (06) :677-688
[10]  
BIANCO L, 1988, NAV RES LOG, V35, P177, DOI 10.1002/1520-6750(198804)35:2<177::AID-NAV3220350203>3.0.CO