共 137 条
[82]
Moore J. E., 1975, AIIE Transactions, V7, P35, DOI 10.1080/05695557508974982
[83]
Moore J. M., 1967, Production and Inventory Management, V8, P1
[84]
MORIN TL, 1976, OPER RES, V3, P611
[85]
NABESHIMA I, 1963, J OPER RES SOC JPN, V5, P97
[86]
GROUP PRODUCTION SCHEDULING FOR MINIMUM TOTAL TARDINESS .1.
[J].
AIIE TRANSACTIONS,
1978, 10 (02)
:157-162
[87]
NAKAMURA N, 1976, T JAPAN SOC MECH ENG, V22, P1964
[88]
OVACIK JM, 1992, INT J PROD RES, V32, P1243