Integrated optimization of production planning and scheduling for a kind of job-shop

被引:49
作者
Zhang, XD [1 ]
Yan, HS [1 ]
机构
[1] Southeast Univ, Res Inst Automat, Nanjing 210096, Jaingsu, Peoples R China
基金
中国国家自然科学基金;
关键词
batches; hybrid genetic algorithm; job-shop; production planning and scheduling; setup;
D O I
10.1007/s00170-003-2042-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper addresses an integrated job-shop production planning and scheduling problem with setup time and batches. It not only considers the setup cost, work-in-process inventory, product demand, and the load of equipment, but also the detailed scheduling constraints. That is a way different from the traditional hierarchical production planning method. The hierarchical methods do not consider the detailed scheduling constraints, so it cannot guarantee to obtain a feasible production plan. Here the integrated problem is formulated as a nonlinear mixed integer program model. And in order to simultaneously optimize the production plan and the schedule, an improved hybrid genetic algorithm (HGA) is given. In the model, the detailed scheduling constraints are used to compute the accurate load of a device in order to obtain a feasible production plan. The heuristic scheduling rules such as the shortest processing time (SPT) and the longest processing time (LPT) are used to generate a better initial solution. Also, a subsection coding strategy is offered to convert the planning and scheduling solution into a chromosome. At last, a comparison is made between the hybrid algorithm and a hierarchical production planning and scheduling method, showing that the hybrid algorithm can solve the problem effectively.
引用
收藏
页码:876 / 886
页数:11
相关论文
共 18 条
[1]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[2]   Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups [J].
Anwar, MF ;
Nagi, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (05) :1447-1470
[3]   A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies [J].
Cheng, RW ;
Gen, M ;
Tsujimura, Y .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (02) :343-364
[4]   Optimization of the keyboard arrangement problem using an Ant Colony algorithm [J].
Eggers, J ;
Feillet, D ;
Kehl, S ;
Wagner, MO ;
Yannou, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 148 (03) :672-686
[5]  
GEN M, 1997, GENETIC ALGORITHMS E
[6]   Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities [J].
Haase, K ;
Kimms, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 66 (02) :159-169
[7]   SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED SCHEDULING [J].
JEFFCOAT, DE ;
BULFIN, RL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (01) :43-51
[8]   Large-scale optimal VAR planning by hybrid simulated annealing/genetic algorithm [J].
Jwo, WS ;
Liu, CW ;
Liu, CC .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1999, 21 (01) :39-44
[9]   A genetic algorithm for multi-level, multi-machine lot sizing and scheduling [J].
Kimms, A .
COMPUTERS & OPERATIONS RESEARCH, 1999, 26 (08) :829-848
[10]   A production scheduling problem using genetic algorithm [J].
Knosala, R ;
Wal, T .
JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2001, 109 (1-2) :90-95