Robust scheduling and robustness measures for the discrete time/cost trade-off problem

被引:111
作者
Hazir, Oencue [1 ,4 ]
Haouari, Mohamed [2 ,3 ]
Erel, Erdal [4 ]
机构
[1] Cankaya Univ, Dept Ind Engn, TR-06530 Ankara, Turkey
[2] Univ 7th November,Carthage, ROI, Tunisia Polytech Sch, Tunis, Tunisia
[3] Ozyegin Univ, Dept Ind Engn, Fac Engn, Istanbul, Turkey
[4] Bilkent Univ, Fac Business Adm, Ankara, Turkey
关键词
Project scheduling; Time/cost trade-off; Robustness; Simulation; PROJECT NETWORKS; DECOMPOSITION; STABILITY; MANAGEMENT; ALGORITHM; MAKESPAN;
D O I
10.1016/j.ejor.2010.05.046
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Projects are often subject to various sources of uncertainties that have a negative impact on activity durations and costs. Therefore, it is crucial to develop effective approaches to generate robust project schedules that are less vulnerable to disruptions caused by uncontrollable factors. In this paper, we investigate the robust discrete time/cost trade-off problem, which is a multi-mode project scheduling problem with important practical relevance. We introduce surrogate measures that aim at providing an accurate estimate of the schedule robustness. The pertinence of each proposed measure is assessed through computational experiments. Using the insights revealed by the computational study, we propose a two-stage robust scheduling algorithm. Finally, we provide evidence that the proposed approach can be extended to solve a complex robust problem with tardiness penalties and earliness revenues. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:633 / 643
页数:11
相关论文
共 31 条
  • [1] Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
    Akkan, C
    Drexl, A
    Kimms, A
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 339 - 358
  • [2] A bi-objective model for robust resource-constrained project scheduling
    Al-Fawzan, MA
    Haouari, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 175 - 187
  • [3] [Anonymous], REV FRANCAISE RECHER
  • [4] [Anonymous], 2000, Simulation modeling and analysis
  • [5] OPTIMAL REDUCTION OF 2-TERMINAL DIRECTED ACYCLIC GRAPHS
    BEIN, WW
    KAMBUROWSKI, J
    STALLMANN, MFM
    [J]. SIAM JOURNAL ON COMPUTING, 1992, 21 (06) : 1112 - 1129
  • [6] A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
    Chtourou, Hedi
    Haouari, Mohamed
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 55 (01) : 183 - 194
  • [7] Complexity of the discrete time-cost tradeoff problem for project networks
    De, P
    Dunne, EJ
    Ghosh, JB
    Wells, CE
    [J]. OPERATIONS RESEARCH, 1997, 45 (02) : 302 - 306
  • [8] THE DISCRETE TIME-COST TRADEOFF PROBLEM REVISITED
    DE, P
    DUNNE, EJ
    GHOSH, JB
    WELLS, CE
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) : 225 - 238
  • [9] Proactive heuristic procedures for robust project scheduling: An experimental analysis
    de Vonder, Stijn Van
    Demeulemeester, Erik
    Herroelen, Willy
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 723 - 733
  • [10] Demeulemeester E, 1998, J OPER RES SOC, V49, P1153, DOI 10.2307/3010096