Computer-aided RCM-based plant maintenance management system

被引:121
作者
Gabbar, HA [1 ]
Yamashita, H [1 ]
Suzuki, K [1 ]
Shimada, Y [1 ]
机构
[1] Okayama Univ, Dept Syst Engn, Okayama 7008530, Japan
关键词
RCM; CMMS; maintenance management; reliability; maintenance integrated system;
D O I
10.1016/S0736-5845(03)00031-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 [计算机应用技术]; 0835 [软件工程];
摘要
In most of the industries, classical reliability-centered maintenance (RCM) is employed to decide the maintenance strategies using reliability data without having adequate interaction with the design and operational systems. This means that the RCM process will be conducted with no or limited access to the design and operational data/knowledge. Commonly, the developed maintenance strategies are implemented and managed within the computerized maintenance management system (CMMS), which is usually separate from the RCM automated environment. This paper presents the detailed system design and mechanism of improved RCM process as integrated with CMMS. The proposed solution is integrated with design and operational systems and consolidates some successful maintainability approaches to formulate an effective solution for optimized plant maintenance. The major components of the enhanced RCM process are identified and a prototype system is implemented as integrated with the various modules of the adopted CMMS (MAXIMO(TM)). A case study is used to show the effectiveness of the proposed RCM-based CMMS solution in optimizing plant maintenance over the traditional approaches. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:449 / 458
页数:10
相关论文
共 26 条
[1]
A reliability based maintenance policy; A case study [J].
Abdul-Nour, G ;
Beaudoin, H ;
Ouellet, P ;
Rochette, R ;
Lambert, S .
COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (3-4) :591-594
[2]
ANDERSON RT, 1990, RELIABILITY CENTERED
[3]
A review of methods and applications of reliability analysis for structural integrity assessment of UK nuclear plant [J].
Bullough, R ;
Green, VR ;
Tomkins, B ;
Wilson, R ;
Wintle, JB .
INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 1999, 76 (13) :909-919
[4]
Inference and test in modeling the failure/repair process of repairable mechanical equipments [J].
Calabria, R ;
Pulcini, G .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2000, 67 (01) :41-53
[5]
Genetic algorithms and Monte Carlo simulation for optimal plant design [J].
Cantoni, M ;
Marseguerra, M ;
Zio, E .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2000, 68 (01) :29-38
[6]
Refining the delay-time-based PM inspection model with non-negligible system downtime estimates of the expected number of failures [J].
Christer, AH ;
Lee, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 67 (01) :77-85
[7]
Age-related maintenance versus reliability centred maintenance: a case study on aero-engines [J].
Crocker, J ;
Kumar, UD .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2000, 67 (02) :113-118
[8]
Risk-based approaches to ageing and maintenance management [J].
Duthie, JC ;
Robertson, MI ;
Clayton, AM ;
Lidbury, DPG .
NUCLEAR ENGINEERING AND DESIGN, 1998, 184 (01) :27-38
[9]
An expert system for reliability centered maintenance in the chemical industry [J].
Fonseca, DJ ;
Knapp, GM .
EXPERT SYSTEMS WITH APPLICATIONS, 2000, 19 (01) :45-57
[10]
GABBAR HA, 2000, INT S DES OP CONTR N, P387