Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach

被引:180
作者
Ameyaw, Effah Ernest [1 ]
Chan, Albert P. C. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
关键词
Water supply; Public-private partnership; Risk assessment; Fuzzy synthetic evaluation; URBAN WATER; MODEL; INFRASTRUCTURE; ALLOCATION; SYSTEM;
D O I
10.1016/j.eswa.2015.02.041
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
As governments embark on public private partnerships (PPPs) to develop their water infrastructure, effective risk assessment, which has remained nebulous, has become an important step to ensure success of these projects. This paper investigates the risk factors and assesses the risk level of PPP water supply projects in developing countries using fuzzy synthetic evaluation (FSE) approach. A 40-factor risk list was established through investigation in water projects cases and related literature and an industry-wide questionnaire survey with industry practitioners. Initial statistical analysis yielded 22 critical risk factors that would have significant impacts on water supply partnerships. These factors were categorized into three principal factors (financial/commercial, legal and socio-political, and technical) forming the input variables for FSE analysis. The study showed that the overall risk level of water PPPs in developing countries is high, suggesting that these projects are risky to both governments and private participants. The fuzzy analysis, overall, confirmed that financial/commercial risk category is the most critical principal factor, followed by legal and socio-political category and technical category. The FSE approach to risk assessment can be used as an initial screening to establish risk factors that require attention of management and further detailed analysis. This study demonstrates that FSE methodology can be used to synthetically analyze local conditions in a country prior to setting up the project structure and normal due diligence. It is a multi-attribute risk assessment framework and may serve as a risk evaluation tool for private investors, policy-makers and decision-makers. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:5102 / 5116
页数:15
相关论文
共 85 条
  • [71] Tah J.H.M., 2000, CONSTR MANAG ECON, V18, P491, DOI [10.1080/01446190050024905, DOI 10.1080/01446190050024905]
  • [72] Modelling and assessment of critical risks in BOT road projects
    Thomas, A. V.
    Kalidindi, Satyanarayana N.
    Ganesh, L. S.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (04) : 407 - 424
  • [73] UNIDO, 1996, GUID INFR DEV BUID O
  • [74] United Nations Habitat, 2008, STAT AFR CIT 2008 FR
  • [75] Vives A., 2010, J CONSTR ENG M ASCE, P412
  • [76] Vives A., 2006, FIANANCIAL STRUCTURI
  • [77] Whitfield L., 2006, Review of African Political Economy, V33, P425, DOI 10.1080/03056240601000812
  • [78] Risk criticality and allocation in privatised water supply projects in Indonesia
    Wibowo, Andreas
    Mohamed, Sherif
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (05) : 504 - 513
  • [79] The financial risks in build-operate-transfer projects
    Xenidis, Yiannis
    Angelides, Demos
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (04) : 431 - 441
  • [80] IDENTIFICATION AND ALLOCATION OF RISKS ASSOCIATED WITH PPP WATER PROJECTS IN CHINA
    Xu, Yelin
    Yang, Yunfang
    Chan, Albert P. C.
    Yeung, John F. Y.
    Cheng, Hu
    [J]. INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2011, 15 (03) : 275 - 294