The build-operate-transfer (BOT) approach for developing infrastructure projects is a technique that allows fast realization of public works in cases of a shortage of public funds. This process is full of risks, due mainly to the complexity and extend of the disciplines, public agencies and stakeholders involved. The identification, classification and presentation of a comprehensive list of this type of risks will provide BOT project practitioners with a useful tool in the effort of setting up successfully a BOT concession agreement. The approach presented provides a practical insight into 27 financial risks, which are associated with the BOT projects in their lifecycle. This is achieved through proper justification and description of the content of each risk. Furthermore, a categorization of the risks is presented, according to the stage at which they occur and the sources of their origin. The findings of this research would facilitate the risk analysis process that is being conducted by risk managers prior to bidding for a BOT project and during the negotiation period.
引用
收藏
页码:431 / 441
页数:11
相关论文
共 15 条
  • [1] Risk management in international construction joint ventures
    Bing, L
    Tiong, RLK
    Fan, WW
    Chew, DAS
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (04): : 277 - 284
  • [2] Eales B.A., 1995, FINANCIAL RISK MANAG
  • [3] ICRAM-1: Model for international construction risk assessment
    Hastak, M
    Shaked, A
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2000, 16 (01) : 59 - 69
  • [4] PREDICTORS OF COST-OVERRUN RATES
    JAHREN, CT
    ASHE, AM
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (03): : 548 - 552
  • [5] Exchange rate risk management in international construction ventures
    Kapila, P
    Hendrickson, C
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (04) : 186 - 191
  • [6] kumaraswamy M.M, 2001, INT J PROJ MANAG, V19, P195, DOI DOI 10.1016/S0263-7863(99)00069-1
  • [7] Menheere Sebastiaan, 1996, CASE STUDIES BUILD O
  • [8] Papadopoulos D.L., 1993, INTRO FINANCING ORG
  • [9] Price D., 1996, P ON DAY C ATH INT H
  • [10] Alternate financing strategies for build-operate-transfer projects
    Schaufelberger, JE
    Wipadapisut, I
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (02): : 205 - 213