Dynamic change management for construction:: introducing the change cycle into model-based project management

被引:80
作者
Park, M
Peña-Mora, F
机构
[1] Natl Univ Singapore, Sch Design & Environm, Dept Bldg, Singapore 117566, Singapore
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
关键词
D O I
10.1002/sdr.273
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In construction, rework (redoing previously completed work) has a considerable impact on project performance. As a result, construction managers often avoid rework on problematic tasks by modifying the design and specification of downstream tasks ("change"). Such a managerial action, however, can disturb the construction sequence by triggering non-value-ad ding change iterations among construction processes, which often contributes to unanticipated schedule delays and cost overruns. In order to address this challenging issue, different characteristics and behavior patterns of construction changes are identified, and compared to those of construction rework. Change impact on project performance is analyzed according to change characteristics, and to discovery status and time. All research findings are then incorporated into a cohesive dynamic project model. An application example of the project model demonstrates how model-based change management can enhance project performance in a real-world setting by providing effective management plans and policy guidelines. Finally, it is concluded that the model-based approach can be more effective, when combined with other managerial efforts such as reducing the process time and increasing the level of coordination among project functions. Copyright (C) 2003 John Wiley Sons, Ltd.
引用
收藏
页码:213 / 242
页数:30
相关论文
共 32 条
  • [11] HINES J, 1999, APPL SYSTEM DYNAMICS
  • [12] HOMER J, 1993, P 1993 INT SYST DYN
  • [13] KWAK S, 1995, THESIS MIT CAMBRIDGE
  • [14] FACTORS AFFECTING CONSTRUCTION-PLANNING OUTCOMES
    LAUFER, A
    COHENCA, D
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (01): : 135 - 156
  • [15] LYNEIS J, 1999, DYNAMICS PROJECT PER
  • [16] Strategic management of complex projects: a case study using system dynamics
    Lyneis, JM
    Cooper, KG
    Els, SA
    [J]. SYSTEM DYNAMICS REVIEW, 2001, 17 (03) : 237 - 260
  • [17] MARTINEZ JC, 1997, P CONSTR C ASCE REST, V5
  • [18] Simulation modeling and management of large basement construction project
    Ng, WM
    Khor, EL
    Tiong, LK
    Lee, J
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1998, 12 (02) : 101 - 110
  • [19] RESOURCE STRATEGIES FOR DYNAMIC PROJECT-MANAGEMENT
    PADILLA, EM
    CARR, RI
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 279 - 293
  • [20] Park M., 2001, THESIS MIT CAMBRIDGE