Response time and vendor-assembler relationship in a supply chain

被引:4
作者
Ahn, Scongje
Rhim, Hosun
Seog, S. Hun
机构
[1] Korea Adv Inst Sci & Technol, Grad Sch Finance, Seoul 130722, South Korea
[2] Korea Univ, Sch Business, Seoul 136701, South Korea
[3] Univ Seoul, Sch Business Adm, Seoul 130743, South Korea
关键词
supply chain management; response time; incentive scheme; contract; long-term and short-term relationships;
D O I
10.1016/j.ejor.2006.10.049
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Relationships between an assembler and a vendor in a supply chain are investigated in two-period models when the assembler wants to reduce response time by incentive systems. The assembler may offer myopic or farsighted incentive contracts to the vendor, under short-term or long-term relationships. Incentive schemes, effort levels, and expected payoffs under different perspectives and relationships are examined. We find that a farsighted assembler provides the vendor with a higher incentive than a myopic assembler in the first period. A long (short)-term relationship is preferred if the value of farsightedness under a long-term relationship is greater (less) than the switching option value under a short-term relationship. We propose several sufficient conditions regarding which perspectives and relationships are preferred. (C) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:652 / 666
页数:15
相关论文
共 19 条
[11]  
KENNEY M, 1993, MASS PRODUTION JAPAN
[12]   Lead time and response time in a pull production control system [J].
Kim, I ;
Tang, CS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 101 (03) :474-485
[13]   Flexible and risk-sharing supply contracts under price uncertainty [J].
Li, CL ;
Kouvelis, P .
MANAGEMENT SCIENCE, 1999, 45 (10) :1378-1398
[14]   MANAGING SUPPLIERS - INCENTIVE SYSTEMS IN JAPANESE AND UNITED-STATES INDUSTRY [J].
MCMILLAN, J .
CALIFORNIA MANAGEMENT REVIEW, 1990, 32 (04) :38-55
[15]  
RHIM H, 1998, INT J MANAGEMENT SCI, V4, P59
[16]  
RICHARDSON J, 1993, MANAGE INT REV, V33, P53
[17]  
STALK G, 1988, HARVARD BUS REV, V66, P41
[18]  
TANG CS, 1991, SUPPLY CONTRACTS SPE
[19]   The quantity flexibility contract and supplier-customer incentives [J].
Tsay, AA .
MANAGEMENT SCIENCE, 1999, 45 (10) :1339-1358