Lot sizing in reverse MRP for scheduling disassembly

被引:55
作者
Barba-Gutierrez, Y. [1 ]
Adenso-Diaz, B. [1 ]
Gupta, S. M. [2 ]
机构
[1] Univ Oviedo, Escuela Politecn Super Ingn, Gijon 33204, Spain
[2] Northeastern Univ, Dept Mech & Ind Engn, Boston, MA 02115 USA
关键词
reverse logistics; MRP; lot sizing;
D O I
10.1016/j.ijpe.2007.03.017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Gupta and Taleb (1994. Scheduling disassembly. International Journal of Production Research, 32(8), 1857-1866) presented an algorithm for reverse MRP that can be applied to a product structure in which there is a certain demand for components and a need to know the number of products to disassemble in order to fulfil the demand for those components. However, that algorithm did not consider lot sizing at all. Incorporating lot sizing makes the problem a great deal more challenging in disassembly situations because of the disparity between the number of components present in the product and the demand of the components. This is because the demand for the components is often not in the same proportion as their existence in the product structure causing excess inventories for the components with low demand compared to their brother items. In this paper we present an algorithm for reverse MRP to facilitate the use of lot sizing. An example is presented and its implementation is analysed. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:741 / 751
页数:11
相关论文
共 43 条
[1]   PRODUCT STRUCTURE COMPLEXITY AND MULTILEVEL LOT SIZING USING ALTERNATIVE COSTING POLICIES [J].
BENTON, WC ;
SRIVASTAVA, R .
DECISION SCIENCES, 1985, 16 (04) :357-369
[2]   A COMPARISON OF STRATEGIES TO DAMPEN NERVOUSNESS IN MRP SYSTEMS [J].
BLACKBURN, JD ;
KROPP, DH ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1986, 32 (04) :413-429
[3]   Impact of product structure on order review/evaluation procedures [J].
Bragg, DJ ;
Duplaga, EA ;
Penlesky, RJ .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2005, 105 (3-4) :307-324
[4]   Cyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processes [J].
Brander, P ;
Forsberg, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (02) :295-310
[5]   OPERATIONS PLANNING ISSUES IN AN ASSEMBLY DISASSEMBLY ENVIRONMENT [J].
BRENNAN, L ;
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1994, 14 (09) :57-67
[6]   LESS NERVOUS MRP SYSTEMS - DYNAMIC ECONOMIC LOT-SIZING APPROACH [J].
CARLSON, RC ;
JUCKER, JV ;
KROPP, DH .
MANAGEMENT SCIENCE, 1979, 25 (08) :754-761
[7]  
Choi HG., 1984, J OPERATIONS MANAGEM, V4, P259, DOI [10.1016/0272-6963(84)90015-9, DOI 10.1016/0272-6963(84)90015-9]
[8]   Scheduling policies for remanufacturing [J].
Guide, VDR ;
Kraus, ME ;
Srivastava, R .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (02) :187-204
[9]   Issues in environmentally conscious manufacturing and product recovery: a survey [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) :811-853
[10]   Disassembly line in product recovery [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (11) :2569-2589