共 23 条
[4]
Cavalieri S, 2000, IEEE IND ELEC, P1298, DOI 10.1109/IECON.2000.972309
[6]
CAVALIERI S, 1999, P 2 INT WORKSH INT M, P225
[7]
FREY D, 2001, P 3 DFG C GERM PRIOR
[8]
Impact of interruptions on schedule execution in flexible manufacturing systems
[J].
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS,
2002, 14 (04)
:319-344
[10]
NAGI K, 2001, LECT NOTES COMPUTER, V2249