Benchmarking and robust multi-agent-based production planning and control

被引:15
作者
Frey, D
Nimis, J
Wörn, H
Lockemann, P
机构
[1] Univ Karlsruhe, Inst Proc Control & Robot, D-76131 Karlsruhe, Germany
[2] Univ Karlsruhe, Inst Program Struct & Data Org, D-76128 Karlsruhe, Germany
关键词
modelling; simulation; production planning; scheduling; flexibility; reliability and multi-agent approach;
D O I
10.1016/S0952-1976(03)00075-7
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Multi-agent systems (MAS) offer new perspectives compared to conventional, centrally organised architectures in the scope of production planning and control. They are expected to be more flexible and robust while dealing with a turbulent production environment and disturbances. In this paper, an MAS is developed and compared to an Operations Research Job-Shop algorithm using a simulation-based benchmarking scenario. Environmental constraints for a successful application of MAS are identified and classified. Furthermore, the topic of MAS robustness is addressed by applying database technologies on the basis of transactions. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:307 / 320
页数:14
相关论文
共 23 条
[1]   Reactive scheduling using a multi-agent model: the SCEP framework [J].
Archimede, B ;
Coudert, T .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2001, 14 (05) :667-683
[2]   Performance comparison and analysis of reactive and planning-based control architectures for manufacturing [J].
Brennan, RW .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2000, 16 (2-3) :191-200
[3]   Benchmarking the performance of manufacturing control systems: design principles for a web-based simulated testbed [J].
Cavalieri, S ;
Macchi, M ;
Valckenaers, P .
JOURNAL OF INTELLIGENT MANUFACTURING, 2003, 14 (01) :43-58
[4]  
Cavalieri S, 2000, IEEE IND ELEC, P1298, DOI 10.1109/IECON.2000.972309
[5]   An experimental benchmarking of two multi-agent architectures for production scheduling and control [J].
Cavalieri, S ;
Garetti, M ;
Macchi, M ;
Taisch, M .
COMPUTERS IN INDUSTRY, 2000, 43 (02) :139-152
[6]  
CAVALIERI S, 1999, P 2 INT WORKSH INT M, P225
[7]  
FREY D, 2001, P 3 DFG C GERM PRIOR
[8]   Impact of interruptions on schedule execution in flexible manufacturing systems [J].
Jain, S ;
Foley, WJ .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2002, 14 (04) :319-344
[9]   Comparing the effectiveness of workload balancing objectives in FMS loading [J].
Kumar, N ;
Shanker, K .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (05) :843-871
[10]  
NAGI K, 2001, LECT NOTES COMPUTER, V2249