Lot streaming for product assembly in job shop environment

被引:56
作者
Chan, F. T. S. [1 ]
Wong, T. C. [1 ]
Chan, L. Y. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
assembly job shop; lot streaming; genetic algorithms; dispatching rules;
D O I
10.1016/j.rcim.2007.01.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Assembly job shop scheduling problem (AJSP) is an extension of classical job shop scheduling problem (JSP). AJSP starts with JSP and appends an assembly stage to the completed jobs. Lot streaming (LS) technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. This paper combines, for the first time, LS and AJSP, extending LS applicability to both machining and assembly. To solve this complex problem, an efficient algorithm is proposed using genetic algorithms and simple dispatching rules. Experimental results suggest that equal size LS outperforms varied size LS with respect to the objective function. (C) 2007 Published by Elsevier Ltd.
引用
收藏
页码:321 / 331
页数:11
相关论文
共 20 条
[1]   A comprehensive review of lot streaming [J].
Chang, JH ;
Chiu, HN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (08) :1515-1536
[2]   Lot streaming in job-shop scheduling [J].
DauzerePeres, S ;
Lasserre, JB .
OPERATIONS RESEARCH, 1997, 45 (04) :584-595
[3]   Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly [J].
Guide, VDR ;
Souza, GC ;
van der Laan, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 164 (02) :341-353
[4]   Priority scheduling policies for repair shops [J].
Guide, VDR ;
Srivastava, R ;
Kraus, ME .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (04) :929-950
[5]  
Holland J.H., 1975, Adoption in Natural and Artificial systerm
[6]   Knowledge-based tool for planning of enterprise resources in ASEAN SMEs [J].
Huin, SF ;
Luong, LHS ;
Abhary, K .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2003, 19 (05) :409-414
[7]   A batch splitting method for a job shop scheduling problem in an MRP environment [J].
Jeong, HI ;
Park, J ;
Leachman, RC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (15) :3583-3598
[8]   Simulated annealing and genetic algorithms for scheduling products with multi-level product structure [J].
Kim, JU ;
Kim, YD .
COMPUTERS & OPERATIONS RESEARCH, 1996, 23 (09) :857-868
[9]   A genetic algorithm for multi-level, multi-machine lot sizing and scheduling [J].
Kimms, A .
COMPUTERS & OPERATIONS RESEARCH, 1999, 26 (08) :829-848
[10]   Lot streaming and scheduling heuristics for m-machine no-wait flowshops [J].
Kumar, S ;
Bagchi, TP ;
Sriskandarajah, C .
COMPUTERS & INDUSTRIAL ENGINEERING, 2000, 38 (01) :149-172