Project scheduling with multiple modes: A genetic algorithm

被引:186
作者
Hartmann, S
机构
[1] Univ Kiel, Inst Betriebswirtschaftslehre, Lehrstuhl Prod & Logistik, D-24118 Kiel, Germany
[2] LOGAS Gesell Logist Anwendungssyst mbH, D-20457 Hamburg, Germany
关键词
project management and scheduling; multiple modes; genetic algorithms; local search; computational results;
D O I
10.1023/A:1010902015091
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we consider the resource-constrained project scheduling problem with multiple execution modes for each activity and makespan minimization as objective. We present a new genetic algorithm approach to solve this problem. The genetic encoding is based on a precedence feasible list of activities and a mode assignment. After defining the related crossover, mutation, and selection operators, we describe a local search extension which is employed to improve the schedules found by the basic genetic algorithm. Finally, we present the results of our thorough computational study. We determine the best among several different variants of our genetic algorithm and compare it to four other heuristics that have recently been proposed in the literature. The results that have been obtained using a standard set of instances show that the new genetic algorithm outperforms the other heuristic procedures with regard to a lower average deviation from the optimal makespan.
引用
收藏
页码:111 / 135
页数:25
相关论文
共 31 条
[1]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[2]  
BACKHAUS K, 1996, MULTIVARIATE ANALYSE
[3]   Resource-constrained project scheduling by simulated annealing [J].
Boctor, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) :2335-2351
[4]   A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes [J].
Boctor, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :349-361
[5]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[6]  
BOULEIMEN K, 1998, P 6 INT WORKSH PROJ, P19
[7]   NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DREXL, A ;
GRUENEWALD, J .
IIE TRANSACTIONS, 1993, 25 (05) :74-81
[8]  
EIBEN AE, 1991, LECT NOTES COMPUT SC, V496, P4
[9]  
Elmaghraby S.E., 1977, Activity Networks: Project Planning and Control by Network Models
[10]  
Hartmann S, 1998, NAV RES LOG, V45, P733, DOI 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO