Optimal planning of a dynamic pump-treat-inject groundwater remediation system

被引:42
作者
Chang, Liang-Cheng
Chu, Hone-Jay
Hsiao, Chin-Tsai
机构
[1] Natl Chiao Tung Univ, Dept Civil Engn, Hsinchu 30010, Taiwan
[2] Chungchou Inst Technol, Dept Informat Management, Changhua 510, Taiwan
关键词
optimal planning; differential dynamic programming; genetic algorithm; pump-treat-inject; remediation;
D O I
10.1016/j.jhydrol.2007.05.030
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study integrates the genetic algorithm (GA) and constrained differential dynamic programming (CDDP) to design the pump-treat-inject system. The proposed model. considers both the cost of installing wells (fixed cost) and the operating cost of pumping, injection and water treatment. To minimize the total cost white meeting the water quality constraints, the model can compute the optimal number and locations of wells, as welt as the associated optimal pumping and injection schemes. Various numerical cases reveal that the requirement to balance the total volume between pumping and injection can significantly influence the final optimal design. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:295 / 304
页数:10
相关论文
共 24 条
[1]   OPTIMAL-CONTROL OF GROUNDWATER QUALITY MANAGEMENT - NONLINEAR-PROGRAMMING APPROACH [J].
ALIREZA, S ;
HOWITT, RE ;
MARINO, MA .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1994, 120 (06) :962-982
[2]   Comparison of a genetic algorithm and mathematical programming to the design of groundwater cleanup systems [J].
Aly, AH ;
Peralta, PC .
WATER RESOURCES RESEARCH, 1999, 35 (08) :2415-2425
[3]   Optimization of pump-treat-inject (PTI) design for the remediation of a contaminated aquifer: multi-stage design with chance constraints [J].
Bear, J ;
Sun, YW .
JOURNAL OF CONTAMINANT HYDROLOGY, 1998, 29 (03) :225-244
[4]   OPTIMAL TIME-VARYING PUMPING RATES FOR GROUNDWATER REMEDIATION - APPLICATION OF A CONSTRAINED OPTIMAL-CONTROL ALGORITHM [J].
CHANG, LC ;
SHOEMAKER, CA ;
LIU, PLF .
WATER RESOURCES RESEARCH, 1992, 28 (12) :3157-3173
[5]   Dynamic optimal ground water remediation including fixed and operation costs [J].
Chang, LC ;
Hsiao, CT .
GROUND WATER, 2002, 40 (05) :481-490
[6]  
Cohen R.M., 1994, EPA600R94123 RS KERR
[7]   DYNAMIC OPTIMAL-CONTROL FOR GROUNDWATER REMEDIATION WITH FLEXIBLE MANAGEMENT PERIODS [J].
CULVER, TB ;
SHOEMAKER, CA .
WATER RESOURCES RESEARCH, 1992, 28 (03) :629-641
[8]   Dynamic optimal ground water remediation by granular activated carbon [J].
Culver, TB ;
Shenk, GW .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1998, 124 (01) :59-64
[9]   OPTIMAL-CONTROL FOR GROUNDWATER REMEDIATION BY DIFFERENTIAL DYNAMIC-PROGRAMMING WITH QUASI-NEWTON APPROXIMATIONS [J].
CULVER, TB ;
SHOEMAKER, CA .
WATER RESOURCES RESEARCH, 1993, 29 (04) :823-831
[10]   Injection-extraction treatment well pairs: An alternative to permeable reactive barriers [J].
Cunningham, JA ;
Reinhard, M .
GROUND WATER, 2002, 40 (06) :599-607