Heuristic algorithms for scheduling an automated wet-etch station

被引:31
作者
Bhushan, S [1 ]
Karimi, IA [1 ]
机构
[1] Natl Univ Singapore, Dept Environm Chem & Engn, Singapore 117576, Singapore
关键词
wet-etch station; multi-product plant; resource-constrained scheduling; wafer fabrication; simulated annealing; tabu search;
D O I
10.1016/S0098-1354(03)00192-3
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Wet-etching is a key step in wafer fabrication. A wet-etch station is a chemical batch process involving a complex interplay of mixed intermediate storage (MIS) policies and a shared robot for wafer transfers. Its operation poses a challenging resource-constrained scheduling problem that is crucial for enhancing productivity, improving yield and minimizing contamination. In this paper, we develop three new algorithms for scheduling wafer jobs for a given sequence, which comfortably outperform a literature algorithm in terms of solution quality without requiring excessive effort. Furthermore, we propose a simulated annealing (SA) algorithm for sequencing the wafer jobs. Using this SA algorithm, an existing sequencing algorithm based on tabu search (TS), two job-scheduling algorithms and two algorithms for initial job sequence, we identify eight complete algorithms for scheduling operations in an automated wet-etch station (AWS). After a thorough numerical evaluation, we conclude that the TS sequencing strategy combined with two of our three job-scheduling algorithms is the best option that yields up to 25-30% lower makespans than a literature algorithm, and requires acceptable computing times for industrial-scale problems. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:363 / 379
页数:17
相关论文
共 8 条
[1]   An MILP approach to automated wet-etch station scheduling [J].
Bhushan, S ;
Karimi, IA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (07) :1391-1399
[2]   A tabu search approach to scheduling an automated wet etch station [J].
Geiger, CD ;
Kempf, KG ;
Uzsoy, R .
JOURNAL OF MANUFACTURING SYSTEMS, 1997, 16 (02) :102-116
[3]   On a scheduling problem in a robotized analytical system [J].
Hertz, A ;
Mottet, Y ;
Rochat, Y .
DISCRETE APPLIED MATHEMATICS, 1996, 65 (1-3) :285-318
[4]  
Kalivas J. H., 1995, ADAPTION SIMULATED A
[5]   COMPLETION-TIME ALGORITHMS FOR SERIAL MULTIPRODUCT BATCH PROCESSES WITH SHARED STORAGE [J].
KU, HM ;
KARIMI, I .
COMPUTERS & CHEMICAL ENGINEERING, 1990, 14 (01) :49-69
[6]   AN EVALUATION OF SIMULATED ANNEALING FOR BATCH PROCESS SCHEDULING [J].
KU, HM ;
KARIMI, I .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1991, 30 (01) :163-169
[7]   Scheduling a single-product reentrant process with uniform processing times [J].
Lamba, N ;
Karimi, IK ;
Bhalla, A .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2000, 39 (11) :4203-4214
[8]   PRELIMINARY DESIGN OF MULTIPRODUCT NONCONTINUOUS PLANTS USING SIMULATED ANNEALING [J].
PATEL, AN ;
MAH, RSH ;
KARIMI, IA .
COMPUTERS & CHEMICAL ENGINEERING, 1991, 15 (07) :451-469