An MILP approach to automated wet-etch station scheduling

被引:37
作者
Bhushan, S [1 ]
Karimi, IA [1 ]
机构
[1] Natl Univ Singapore, Dept Environm Chem & Engn, Singapore 117576, Singapore
关键词
D O I
10.1021/ie020296c
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Wet-etching in wafer fabrication is an automated process involving a complex interplay of mixed intermediate policies and material-handling constraints. Its operation poses a challenging resource-constrained flowshop scheduling problem that is crucial for enhancing productivity, improving yield, and minimizing wafer contamination. A novel continuous-time mixed-integer linear programming (MILP) formulation is presented for sequencing and scheduling wafer lots in an automated wet-etch station (AWS). Several reformulations and constraints are numerically evaluated to identify the best formulation. On the basis of this formulation, a near-optimum two-step strategy that is robust with respect to lot transfer times is developed for solving moderately sized problems.
引用
收藏
页码:1391 / 1399
页数:9
相关论文
共 11 条
[1]  
FOWLER JW, 2001, WORKSH PLANN SCHED S
[2]   A tabu search approach to scheduling an automated wet etch station [J].
Geiger, CD ;
Kempf, KG ;
Uzsoy, R .
JOURNAL OF MANUFACTURING SYSTEMS, 1997, 16 (02) :102-116
[3]   COMPLETION-TIME ALGORITHMS FOR SERIAL MULTIPRODUCT BATCH PROCESSES WITH SHARED STORAGE [J].
KU, HM ;
KARIMI, I .
COMPUTERS & CHEMICAL ENGINEERING, 1990, 14 (01) :49-69
[4]   SCHEDULING IN SERIAL MULTIPRODUCT BATCH PROCESSES WITH FINITE INTERSTAGE STORAGE - A MIXED INTEGER LINEAR PROGRAM FORMULATION [J].
KU, HM ;
KARIMI, IA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1988, 27 (10) :1840-1848
[5]   SCHEDULING SEMICONDUCTOR MANUFACTURING PLANTS [J].
KUMAR, PR .
IEEE CONTROL SYSTEMS MAGAZINE, 1994, 14 (06) :33-40
[6]   Scheduling a single-product reentrant process with uniform processing times [J].
Lamba, N ;
Karimi, IK ;
Bhalla, A .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2000, 39 (11) :4203-4214
[7]  
Phillips L.W., 1976, AIIE T, V28, P219
[8]   HOIST SCHEDULING FOR A PCB ELECTROPLATING FACILITY [J].
SHAPIRO, GW ;
NUTTLE, HLW .
IIE TRANSACTIONS, 1988, 20 (02) :157-167
[9]  
Sivakumar A. I., 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. `Simulation - A Bridge to the Future' (Cat. No.99CH37038), P727, DOI 10.1109/WSC.1999.823204
[10]   A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING [J].
UZSOY, R ;
LEE, CY ;
MARTINVEGA, LA .
IIE TRANSACTIONS, 1992, 24 (04) :47-60