共 11 条
[1]
FOWLER JW, 2001, WORKSH PLANN SCHED S
[5]
SCHEDULING SEMICONDUCTOR MANUFACTURING PLANTS
[J].
IEEE CONTROL SYSTEMS MAGAZINE,
1994, 14 (06)
:33-40
[7]
Phillips L.W., 1976, AIIE T, V28, P219
[8]
HOIST SCHEDULING FOR A PCB ELECTROPLATING FACILITY
[J].
IIE TRANSACTIONS,
1988, 20 (02)
:157-167
[9]
Sivakumar A. I., 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. `Simulation - A Bridge to the Future' (Cat. No.99CH37038), P727, DOI 10.1109/WSC.1999.823204