Improving the delivery efficiency of the customer order scheduling problem in a job shop

被引:26
作者
Hsu, Sheng-Yuan [1 ]
Liu, C. -H. [2 ]
机构
[1] Chien Kuo Technol Univ, Dept Ind Engn & Management, Changhua 50094, Taiwan
[2] Natl Pingtung Univ Sci & Technol, Dept Ind Management, Neipu 912, Pingtung, Taiwan
关键词
Customer order scheduling problem; Job shop; Delivery oriented; SINGLE-MACHINE; PARALLEL MACHINES; COMPLEXITY; TIME;
D O I
10.1016/j.cie.2009.02.015
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The focus of this paper is customer order scheduling (COS) problem, where each order consists of a set of jobs that must be shipped as one batch at the same time. In COS each job is part of a customer order and the make-up of the jobs in the order are pre-specified. Most of the existing research deals with COS in a single machine or in a parallel machine shop for developing an optimal solution. COS is common in a normal job shop, and the more complex the shop, the more complex the scheduling. Most existing research has focused on trying to reduce the completion time of the batch. That is, the focus is only on the point in time the last job is finished, while ignoring the actual duration of the jobs within the same order. The longer it takes to complete all the jobs within an order the more it increases the stock of finished goods and the more it deteriorates the efficiency of the logistics and the supply chain management. A new dispatching rule, referred to as Minimum Flow Time Variation (MFV), has been proposed for COS in a normal job shop, in order to reduce the total time it takes to complete all jobs within the same order. That is, the individual completion times of all jobs for the same customer order will be controlled in order to improve the shipping performance. In the simulation test and statistical analysis, the level of work in process (WIP) under the MFV rule in the finished goods warehouse is reduced by more than 70% compared to any other method. The MFV method will efficiently reduce the stock level of finished goods, and controls the waiting time required before they can be shipped. Depending on the environmental factors, the performance of our proposed method will become increasingly significant the more complex the system. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:856 / 866
页数:11
相关论文
共 18 条
[1]   Coordinated scheduling of customer orders for quick response [J].
Ahmadi, R ;
Bagchi, U ;
Roemer, TA .
NAVAL RESEARCH LOGISTICS, 2005, 52 (06) :493-512
[2]   SCHEDULING THE PRODUCTION OF COMPONENTS AT A COMMON FACILITY [J].
BAKER, KR .
IIE TRANSACTIONS, 1988, 20 (01) :32-35
[3]  
BEASLEY JE, 1990, J OPER RES SOC, V41, P1069, DOI 10.2307/2582903
[4]  
Blocher JD, 1996, NAV RES LOG, V43, P629, DOI 10.1002/(SICI)1520-6750(199608)43:5<629::AID-NAV3>3.0.CO
[5]  
2-7
[6]   Customer order scheduling in a general job shop environment [J].
Blocher, JD ;
Chhajed, D ;
Leung, M .
DECISION SCIENCES, 1998, 29 (04) :951-981
[7]   OPTIMAL SCHEDULING OF PRODUCTS WITH 2 SUBASSEMBLIES ON A SINGLE-MACHINE [J].
COFFMAN, EG ;
NOZARI, A ;
YANNAKAKIS, M .
OPERATIONS RESEARCH, 1989, 37 (03) :426-436
[8]   THE CRANE SCHEDULING PROBLEM [J].
DAGANZO, CF .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1989, 23 (03) :159-175
[9]   Customer order scheduling on a single machine with family setup times: Complexity and algorithms [J].
Erel, Erdal ;
Ghosh, Jay B. .
APPLIED MATHEMATICS AND COMPUTATION, 2007, 185 (01) :11-18
[10]   Scheduling the production of two-component jobs on a single machine [J].
Gerodimos, AE ;
Glass, CA ;
Potts, CN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (02) :250-259