Probabilistic LMP Forecasting Considering Load Uncertainty

被引:104
作者
Bo, Rui [1 ]
Li, Fangxing [1 ]
机构
[1] Univ Tennessee, Dept Elect Engn & Comp Sci, Knoxville, TN 37996 USA
关键词
Critical load level; energy markets; load forecasting; locational marginal pricing (LMP); normal distribution; optimal power flow (OPF); power markets; probabilistic LMP forecasting; uncertainty; ELECTRICITY PRICE;
D O I
10.1109/TPWRS.2009.2023268
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In power market studies, the forecast of locational marginal price (LMP) relies on the load forecasting results from the viewpoint of planning. It is well known that short-term load forecasting results always carry certain degree of errors mainly due to the random nature of the load. At the same time, LMP step changes occur at critical load levels (CLLs). Therefore, it is interesting to investigate the impact of load forecasting uncertainty on LMP. With the assumption of a certain probability distribution of the actual load, this paper proposes the concept of probabilistic LMP and formulates the probability mass function of this random variable. The expected value of probabilistic LMP is then derived, as well as the lower and upper bound of its sensitivity. In addition, two useful curves, alignment probability of deterministic LMP versus forecasted load and expected value of probabilistic LMP versus forecasted load, are presented. The first curve is designed to identify the probability that the forecasted price in a deterministic LMP matches the actual price at the forecasted load level. The second curve is demonstrated to be smooth and therefore eliminates the step changes in deterministic LMP forecasting. This helps planners avoid the possible sharp changes during decision-making process. The proposed concept and method are illustrated with a modified PJM five-bus system and the IEEE 118-bus system.
引用
收藏
页码:1279 / 1289
页数:11
相关论文
共 21 条
[1]  
Abramowitz M., 1964, HDB MATH FUNCTIONS F
[2]  
[Anonymous], POW SYST TEST CAS AR
[3]   Forecasting energy prices in a competitive market [J].
Bastian, J ;
Zhu, JX ;
Banunarayanan, V ;
Mukerji, R .
IEEE COMPUTER APPLICATIONS IN POWER, 1999, 12 (03) :40-45
[4]   Effects of load forecast uncertainty on bulk electric system reliability evaluation [J].
Billinton, Roy ;
Huang, Dange .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (02) :418-425
[5]   Study of impacts, of physical contracts and financial contracts on bidding strategies of GENCOs [J].
Chen, XL ;
He, Y ;
Song, YH ;
Nakanishi, Y ;
Nakanishi, C ;
Takahashi, S ;
Sekine, Y .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2004, 26 (09) :715-723
[6]   Locational marginal price sensitivities [J].
Conejo, AJ ;
Castillo, E ;
Mínguez, R ;
Milano, F .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) :2026-2033
[7]   SHORT-TERM LOAD FORECASTING [J].
GROSS, G ;
GALIANA, FD .
PROCEEDINGS OF THE IEEE, 1987, 75 (12) :1558-1573
[8]   Integrated bidding strategies by optimal response to probabilistic locational marginal prices [J].
He, Y ;
Song, YH .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2002, 149 (06) :633-639
[9]   Continuous locational marginal pricing (CLMP) [J].
Li, Fangxing .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :1638-1646
[10]   DCOPF-based LMP simulation: Algorithm, comparison with ACOPF, and sensitivity [J].
Li, Fangxing ;
Bo, Rui .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :1475-1485