Optimizing a production system with rework and equal sized batch shipments

被引:61
作者
Buscher, Udo [1 ]
Lindner, Gerd
机构
[1] Tech Univ Dresden, Fac Business Management & Econ, Dept Ind Management, D-01062 Dresden, Germany
[2] Univ Magdeburg, Fac Econ & Management, Dept Prod & Logist, D-39016 Magdeburg, Germany
关键词
lot sizing; scheduling; rework; batching;
D O I
10.1016/j.cor.2005.03.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In several cases producing new or recovering defective products takes place on a common facility, with these activities are carried out in lots. Consequently, there is a necessity to coordinate the production and rework activities with respect to the timing of operations and also with regard to appropriate lot sizes for both processes while completely satisfying a given demand. Thereby, a decision has to be made on how to assign units completed at one stage to partial lots-called batches-for shipment to the next operation. In this paper we present a lot size model which addresses all of these aspects. Based on total relevant costs per unit time, an optimization method is developed to determine the economic production and rework quantity as well as the corresponding batch sizes for both activities. The algorithm is illustrated by a numerical example followed by a sensitivity analysis of the models behavior under different problem parameters.
引用
收藏
页码:515 / 535
页数:21
相关论文
共 40 条
[31]   OPTIMAL OPERATING POLICY FOR A BOTTLENECK WITH RANDOM REWORK [J].
SO, KC ;
TANG, CS .
MANAGEMENT SCIENCE, 1995, 41 (04) :620-636
[32]   MANUFACTURING CYCLE TIME DETERMINATION FOR A MULTISTAGE ECONOMIC PRODUCTION QUANTITY MODEL [J].
SZENDROVITS, AZ .
MANAGEMENT SCIENCE, 1975, 22 (03) :298-308
[33]  
SZENDROVITS AZ, 1978, J OPER RES SOC, V29, P1017, DOI 10.1057/jors.1978.217
[34]   OPTIMIZING MULTISTAGE PRODUCTION WITH CONSTANT LOT SIZE AND VARYING NUMBERS OF BATCHES [J].
SZENDROVITS, AZ ;
DREZNER, Z .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1980, 8 (06) :623-629
[35]  
SZENDROVITS AZ, 1989, INT HDB PRODUCTION O, P324
[36]   AN INTEGRATED PRODUCTION-INVENTORY MODEL WITH REPROCESSING AND INSPECTION [J].
TAYI, GK ;
BALLOU, DP .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (08) :1299-1315
[37]   Lot-sizing for a single-stage single-product production system with rework of perishable production defectives [J].
Ruud H.Teunter ;
Simme Douwe P. Flapper .
OR Spectrum, 2003, 25 (1) :85-96
[38]   Economic ordering quantities for recoverable item inventory systems [J].
Teunter, RH .
NAVAL RESEARCH LOGISTICS, 2001, 48 (06) :484-495
[39]   RANDOM YIELD, REWORK AND SCRAP IN A MULTISTAGE BATCH MANUFACTURING ENVIRONMENT [J].
WEIN, AS .
OPERATIONS RESEARCH, 1992, 40 (03) :551-563
[40]   LOT-SIZING WITH RANDOM YIELDS - A REVIEW [J].
YANO, CA ;
LEE, HL .
OPERATIONS RESEARCH, 1995, 43 (02) :311-334