Effects of kanban withdrawal policies and other factors on the performance of JIT systems - A simulation study

被引:28
作者
Savsar, M
机构
[1] King Saud University, College of Engineering, Department of Mechanical Engineering, Riyadh, 11421
关键词
D O I
10.1080/00207549608905064
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents the results of a simulation study of a just-in-time (JIT) production control system and its performance under different operational conditions. In particular, the effects of two different kanban withdrawal policies on such performance measures as throughput rate, station utilizations and total work in process levels are investigated. Also, simulation experiments are carried out to determine the effects of processing time variability, number of different types of kanbans allowed at each station and production line length on the mentioned performance measures of JIT production control method. The simulation experiments were carried out for production lines in which processing times of stations were assumed to follow gamma and Erlang distributions.
引用
收藏
页码:2879 / 2899
页数:21
相关论文
共 50 条
[1]   ON SOME FACTORS AFFECTING THE JUST-IN-TIME PRODUCTION SYSTEM OUTPUT VARIABILITY - A SIMULATION STUDY USING TAGUCHI TECHNIQUES [J].
ABDULNOUR, G .
COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) :461-464
[2]   A COMPARATIVE-STUDY OF UNITED-STATES MANUFACTURING FIRMS AT VARIOUS STAGES OF JUST-IN-TIME IMPLEMENTATION [J].
AHMED, NU ;
TUNC, EA ;
MONTAGNO, RV .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (04) :787-802
[3]   MAINTENANCE POLICIES IN JUST-IN-TIME MANUFACTURING LINES [J].
ALBINO, V ;
CARELLA, G ;
OKOGBAA, OG .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (02) :369-382
[4]   DETERMINING THE NUMBER OF KANBANS IN A MULTIPRODUCT, MULTISTAGE PRODUCTION SYSTEM [J].
BARD, JF ;
GOLANY, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (05) :881-895
[5]   A DECOMPOSITION APPROXIMATION FOR PERIODIC KANBAN-CONTROLLED FLOW SHOPS [J].
BERKLEY, BJ .
DECISION SCIENCES, 1992, 23 (02) :291-311
[6]   TANDEM QUEUES AND KANBAN-CONTROLLED LINES [J].
BERKLEY, BJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (10) :2057-2081
[7]   A MATHEMATICAL-PROGRAMMING APPROACH TO A DETERMINISTIC KANBAN SYSTEM [J].
BITRAN, GR ;
LI, C .
MANAGEMENT SCIENCE, 1987, 33 (04) :427-441
[8]   GAMMA DISTRIBUTION AND INVENTORY CONTROL [J].
BURGIN, TA .
OPERATIONAL RESEARCH QUARTERLY, 1975, 26 (03) :507-525
[9]   TOWARDS AN ADAPTIVE KANBAN SYSTEM [J].
CHAUDHURY, A ;
WHINSTON, AB .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (03) :437-458
[10]   DESIGNING PERFORMANCE-MEASUREMENT SYSTEMS FOR JUST-IN-TIME OPERATIONS [J].
CRAWFORD, KM ;
COX, JF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (11) :2025-2036