Effects of kanban withdrawal policies and other factors on the performance of JIT systems - A simulation study

被引:28
作者
Savsar, M
机构
[1] King Saud University, College of Engineering, Department of Mechanical Engineering, Riyadh, 11421
关键词
D O I
10.1080/00207549608905064
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents the results of a simulation study of a just-in-time (JIT) production control system and its performance under different operational conditions. In particular, the effects of two different kanban withdrawal policies on such performance measures as throughput rate, station utilizations and total work in process levels are investigated. Also, simulation experiments are carried out to determine the effects of processing time variability, number of different types of kanbans allowed at each station and production line length on the mentioned performance measures of JIT production control method. The simulation experiments were carried out for production lines in which processing times of stations were assumed to follow gamma and Erlang distributions.
引用
收藏
页码:2879 / 2899
页数:21
相关论文
共 50 条
[21]  
IM JH, 1989, PRODUCTION INVENTORY, V30, P25
[22]  
KABAK IW, 1987, P 9 INT C PROD RES C, P889
[23]   DESIGN AND ANALYSIS OF PULL SYSTEM, A METHOD OF MULTISTAGE PRODUCTION CONTROL [J].
KIMURA, O ;
TERADA, H .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (03) :241-253
[24]   A DYNAMIC-PROGRAMMING MODEL FOR THE KANBAN ASSIGNMENT PROBLEM IN A MULTISTAGE MULTIPERIOD PRODUCTION SYSTEM [J].
LI, AL ;
CO, HC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (01) :1-16
[25]   A SIMULATION ANALYSIS OF SEQUENCING RULES FOR ASRS IN A PULL-BASED ASSEMBLY FACILITY [J].
LINN, RJ ;
XIE, XD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (10) :2355-2367
[26]   BASIC CONCEPTS OF JIT MODELING [J].
MEJABI, O ;
WASSERMAN, GS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (01) :141-149
[27]   DESIGNING AND PHASING IN JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, J ;
WIJNGAARD, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (01) :115-131
[28]  
MONDEN Y, 1986, APPL JUST TIME AM JA
[29]  
MONDEN Y, 1983, TOYATA PRODUCTION SY
[30]   DESCRIBING PROCESSING TIME WHEN SIMULATING JIT ENVIRONMENTS [J].
MURALIDHAR, K ;
SWENSETH, SR ;
WILSON, RL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (01) :1-11