Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system

被引:59
作者
Molinder, A
机构
[1] Department of Production Economics, Linköping Institute of Technology, Linküping
关键词
D O I
10.1080/002075497195498
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper reports on a simulation study of an MRP system affected by stochastic demand and stochastic lead times. Experiments are conducted to assess the impact of three data sets: the amount of lead time variability, the amount of demand variability, and the influence of the stockout cost/inventory holding cost ratio. Lot-sizes, safety stocks and lead times are optimized using simulated annealing. The effects of either using safety stocks or safety lead times are compared to each other with the purpose of finding the best method for protection against uncertainties in lead time and demand.
引用
收藏
页码:983 / 994
页数:12
相关论文
共 8 条
[1]  
[Anonymous], 1981, INT J OPERATIONS PRO
[2]   A SIMULATION-BASED EXPERIMENTAL INVESTIGATION OF SUPPLY TIMING UNCERTAINTY IN MRP SYSTEMS [J].
GRASSO, ET ;
TAYLOR, BW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :485-497
[3]   MRP SYSTEMS UNDER SUPPLY AND PROCESS UNCERTAINTY IN AN INTEGRATED SHOP-FLOOR CONTROL ENVIRONMENT [J].
GUPTA, SM ;
BRENNAN, L .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (01) :205-220
[4]  
MOLINDER A, 1995, MAT REQUIREMENTS PLA
[5]  
New C., 1975, PRODUCTION INVENTORY, V16, P1
[6]  
Press W.H., 1990, NUMERICAL RECIPES C
[7]  
Whybark D. C., 1976, Decision Sciences, V7, P595
[8]   STOCHASTIC LEADTIMES IN 2-LEVEL ASSEMBLY SYSTEMS [J].
YANO, CA .
IIE TRANSACTIONS, 1987, 19 (04) :371-378