A hybrid two-stage flowshop with part family, batch production, major and minor set-ups

被引:40
作者
Li, SL
机构
[1] Faculty of Management, McGill University, Montreal, Que. H3A 1G5
基金
加拿大自然科学与工程研究理事会;
关键词
hybrid flowshop; heuristics; makespan; lot production; part family;
D O I
10.1016/S0377-2217(96)00213-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider a two-stage hybrid flowshop with a single machine at stage 1 and multiple identical machines at stage 2. The flowshop is characterized by major and minor setups, part families and batch production allowing split and no split at stage 2. The parts within a family share a major setup and the parts in a batch share a minor setup. The objective of our problem is to minimize the makespan. We develop two allocation policies with one as a traditional way (called Forward Heuristic) and the other as a non-traditional way (called Backward Heuristic). We also develop several effective sequence rules to further improve the makespan. The computational results show that the Backward Heuristic, in general, is superior to the Forward Heuristic. The sequence rules developed in this paper also perform better than the traditional sequence rules such as SPT and LPT. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:142 / 156
页数:15
相关论文
共 26 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
Buten R. E., 1973, Proceedings of the 1973 Sagamore Computer Conference on Parallel Processing, P130
[3]   ANALYSIS OF CLASSES OF HEURISTICS FOR SCHEDULING A 2-STAGE FLOW-SHOP WITH PARALLEL MACHINES AT ONE-STAGE [J].
CHEN, B .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (02) :234-244
[4]  
CHEN B, 1994, NEW ADV OPTIMIZATION, P1
[5]   BOUNDS ON MULTIPROCESSING TIMING ANOMALIES [J].
GRAHAM, RL .
SIAM JOURNAL ON APPLIED MATHEMATICS, 1969, 17 (02) :416-&
[6]  
Graves S., 1993, LOGISTICS PRODUCTION
[7]   SCHEDULES FOR A 2-STAGE HYBRID FLOWSHOP WITH PARALLEL MACHINES AT THE 2ND STAGE [J].
GUPTA, JND ;
TUNC, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1489-1502
[8]   2-STAGE, HYBRID FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (04) :359-364
[9]   SCHEDULING A 2-STAGE HYBRID FLOWSHOP WITH SEPARABLE SETUP AND REMOVAL TIMES [J].
GUPTA, JND ;
TUNC, EA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 77 (03) :415-428
[10]  
HOOGEVEEN JA, 1995, IN PRESS EUROPEAN J