A hybrid two-stage flowshop with part family, batch production, major and minor set-ups

被引:40
作者
Li, SL
机构
[1] Faculty of Management, McGill University, Montreal, Que. H3A 1G5
基金
加拿大自然科学与工程研究理事会;
关键词
hybrid flowshop; heuristics; makespan; lot production; part family;
D O I
10.1016/S0377-2217(96)00213-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider a two-stage hybrid flowshop with a single machine at stage 1 and multiple identical machines at stage 2. The flowshop is characterized by major and minor setups, part families and batch production allowing split and no split at stage 2. The parts within a family share a major setup and the parts in a batch share a minor setup. The objective of our problem is to minimize the makespan. We develop two allocation policies with one as a traditional way (called Forward Heuristic) and the other as a non-traditional way (called Backward Heuristic). We also develop several effective sequence rules to further improve the makespan. The computational results show that the Backward Heuristic, in general, is superior to the Forward Heuristic. The sequence rules developed in this paper also perform better than the traditional sequence rules such as SPT and LPT. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:142 / 156
页数:15
相关论文
共 26 条
[11]   COMPARATIVE PERFORMANCE ANALYSIS OF PRIORITY RULES IN A CONSTRAINED FLOW-SHOP WITH MULTIPLE PROCESSORS ENVIRONMENT [J].
HUNSUCKER, JL ;
SHAH, JR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 72 (01) :102-114
[12]  
Johnson S. M., 1954, Naval Research Logistics Quarterly, V1, P61, DOI [DOI 10.1002/NAV.3800010110, 10.1002/nav.3800010110]
[13]  
KAN AHG, 1977, MACHINE SCHEDULING P
[14]   INTERSTAGE TRANSPORTATION-PLANNING IN THE DETERMINISTIC FLOWSHOP ENVIRONMENT [J].
LANGSTON, MA .
OPERATIONS RESEARCH, 1987, 35 (04) :556-564
[15]   MINIMIZING MAKESPAN IN HYBRID FLOWSHOPS [J].
LEE, CY ;
VAIRAKTARAKIS, GL .
OPERATIONS RESEARCH LETTERS, 1994, 16 (03) :149-158
[16]  
LI S, 1995, TECHNICAL REPORT HYB
[17]   A COMPARISON OF SEQUENCING RULES FOR A 2-STAGE HYBRID FLOWSHOP [J].
NARASIMHAN, SL ;
MANGIAMELI, PM .
DECISION SCIENCES, 1987, 18 (02) :250-265
[18]   FLOWSHOP SCHEDULING WITH SET-UP, PROCESSING AND REMOVAL TIMES SEPARATED [J].
PROUST, C ;
GUPTA, JND ;
DESCHAMPS, V .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (03) :479-493
[19]  
Salvador M.S., 1973, symposium of the theory of scheduling and applications, P83, DOI DOI 10.1007/978-3-642-80784-8_7
[20]  
SHEN VY, 1972, P C INF SYST SCI, P127