A study on the performance of scheduling rules in buffer-constrained dynamic flowshops

被引:16
作者
Holthaus, O
Rajendran, C
机构
[1] Univ Passau, Dept Operat Prod & Logist Management, Fac Business Adm & Econ, D-94032 Passau, Germany
[2] Indian Inst Technol, Ind Management Div, Dept Humanities & Social Sci, Madras 600036, Tamil Nadu, India
关键词
D O I
10.1080/00207540210146107
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Most studies on scheduling in manufacturing systems using dispatching rules deal with jobshops, while there are only few reports dealing with dynamic flowshops. It is known that the performance of many dispatching rules in dynamic jobshops is different from that in dynamic flowshops. Moreover, many research reports assume that there are no buffer constraints in the shop, and even those reports dealing with buffer-constrained shops present the evaluation of existing dispatching rules for unconstrained shops in the context of buffer constraints with the consideration of a limited number of objectives of scheduling. In this study, we deal with the problem of scheduling in dynamic flowshops with buffer constraints. With respect to different time-based objectives, the best dispatching rules for scheduling in unconstrained shops have been identified from the existing literature. In addition, two new dispatching rules specially designed for flowshops with buffer constraints are proposed. All dispatching rules under consideration are evaluated in dynamic flowshops with buffer constraints on the basis of an extensive simulation study covering different levels of buffer constraints, shop load or utilization, and missing operations in flowshops. The proposed rules are found to perform better than the existing dispatching rules in buffer-constrained flowshops with respect to many measures of performance.
引用
收藏
页码:3041 / 3052
页数:12
相关论文
共 23 条
[1]   2 NEW RULES TO MINIMIZE TARDINESS IN A JOB SHOP [J].
ANDERSON, EJ ;
NYIRENDA, JC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (12) :2277-2292
[2]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[3]   SIMULATION TESTS OF FCFS AND SPT SEQUENCING IN KANBAN SYSTEMS [J].
BERKLEY, BJ .
DECISION SCIENCES, 1993, 24 (01) :218-227
[4]  
BERKLEY BJ, 1991, DECISION SCI, V21, P660
[5]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[6]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P123
[7]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[8]   Input control and dispatching rules in a dynamic CONWIP flow-shop [J].
Framinan, JM ;
Ruiz-Usano, R ;
Leisten, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (18) :4589-4598
[9]   Sequencing CONWIP flow-shops: analysis and heuristics [J].
Framinan, JM ;
Ruiz-Usano, R ;
Leisten, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (12) :2735-2749
[10]  
HAUPT R, 1989, OR SPEKTRUM, V11, P3